Bayshore station

From SgWiki
Revision as of 16:20, 12 May 2018 by Supernutorcrazy (talk | contribs) (Supernutorcrazy moved page Bayshore Station to Bayshore station without leaving a redirect)
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SMRT East West Line: Train service between Tanah Merah and Bugis stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 6) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SBS Transit North East Line: Train service between Serangoon and Punggol stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 21) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
Go-Ahead: From 1 July 2019, Short Trip Service 382A will be introduced to better suit Punggol’s residents needs. Please refer here for more information.
SMRT North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
TE29
Bayshore
碧湾
பேஷோர்
Statistics
Line(s) Thomson–East Coast Line
(Under Construction)

Bayshore (TE29) is a future underground Mass Rapid Transit (MRT) station on the Thomson–East Coast Line.[1]

References

  1. "Joint News Release by the Land Transport Authority & Singapore Land Authority - Thomson-East Coast Line: New MRT Links In The East". Land Transport Authority. Retrieved 15 August 2014.

Template:Thomson East Coast Line