!
|
TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network.
- Please refer here for more information.
- From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
- Please refer to the following
- here for more information on the adjustments.
- here for Shuttle Bus and Train arrangements.
- here for the work map.
- From Monday, 11 November 2024,
- New Supplemantary City Direct Service will be introduced. It will alternate with City Direct Service and call at eight additional bus stops along Buangkok Crescent and Buangkok Link. will ply the same route as its parent between Hougang Street 93 and the city.
- City Direct Service will call at additional additional bus stops along Anchorvale Crescent. The operating hours will also be extended with two additional morning trips and one additional evening trip.
- City Direct Services & will call at ten additional bus stops along Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. The operating hours during the evening peak period will be adjusted.
- Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours.
- Please refer here for more information.
- From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
- Please refer to the following for more information.
|
CR3 Loyang*Graphic From SGTrains/Wikipedia/LTA
|
Statistics
|
Line(s)
|
Cross Island Line (Future)
|
Structure
|
Underground
|
Loyang (CR3) is a future Mass Rapid Transit (MRT) station on the Cross Island Line.[1]
References[edit]