Difference between revisions of "Senja station"

From SgWiki
Jump to navigation Jump to search
m
m
 
Line 1: Line 1:
 
{{Infobox/Station
 
{{Infobox/Station
 
|TA1=RBP
 
|TA1=RBP
|Code={{Code|1|BPLRT|BP13}}
+
|Code={{Code/1|BP13|{{CSS/BPLRT|nofg=|nobc=}}}}
 
|Name=Senja<br>信佳<br>சென்ஜா
 
|Name=Senja<br>信佳<br>சென்ஜா
 
|Img=[[File:Senja-BPLRT.png|centre|300px]]
 
|Img=[[File:Senja-BPLRT.png|centre|300px]]
Line 7: Line 7:
 
  {{Infoline|Address|90 Bukit Panjang Ring Road<br>Singapore 679942}}
 
  {{Infoline|Address|90 Bukit Panjang Ring Road<br>Singapore 679942}}
 
  {{Infoline|Line(s)|{{BPLRT}}}}
 
  {{Infoline|Line(s)|{{BPLRT}}}}
 +
{{Infoline|Structure|Elevated}}
 
  {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]]}}
 
  {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]]}}
 
}}
 
}}
  
'''Segar (BP11)''' is an elevated [[Light Rail Transit]] (LRT) station on the {{BPLRT}}.
+
'''Segar (BP11)''' is a [[Light Rail Transit]] (LRT) station on the {{BPLRT}}.
  
 
==History==
 
==History==
Line 16: Line 17:
 
!width=150|Date!!Event
 
!width=150|Date!!Event
 
|-
 
|-
|6 November 1999||Station officially opens
+
|6 November 1999||Station officially opened
 
|}
 
|}
  
 
===2002 train disruption===
 
===2002 train disruption===
On 21 October 2002, the entire Bukit Panjang LRT was shut down at 6.38am after a disruption caused by a dislodged train wheel, which led to the power system being crippled between {{Stn|Bukit Panjang}} and Senja stations. Partial LRT services only resumed at 6.30pm on 24 October 2002 and full services at 12pm on 26 October 2002.<ref>[//www.getformesingapore.com/homepage2003/mrt_news.htm "Entire LRT system broke down". The Straits Times. 22 Oct 2002]</ref>
+
On 21 October 2002, the entire {{BPLRT|b=}} was shut down at 6.38am after a disruption caused by a dislodged train wheel, which led to the power system being crippled between {{Stn|Bukit Panjang}} and Senja stations. Partial LRT services only resumed at 6.30pm on 24 October 2002 and full services at 12pm on 26 October 2002.<ref>[//web.archive.org/web/20110928112432/www.getformesingapore.com/homepage2003/mrt_news.htm "Entire LRT system broke down"]. Straits Times (22 October 2002).</ref>
 +
 
 +
===2015 train disruption===
 +
On 9 March 2015, during the evening peak hours, the {{BPLRT|b=}} was suspended from service for a full 24 hours due to a power trip which was caused by a fire. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.<ref>[//www.todayonline.com/singapore/power-trip-fire-senja-station-bukit-panjang-lrt-line-shut-night "Bukit Panjang LRT line shut for the night after power trip, fire"]. TODAY (9 March 2015).</ref>
  
 
==Layout==
 
==Layout==
Line 28: Line 32:
 
|colspan=2 class="platform bottom"|Platform 2
 
|colspan=2 class="platform bottom"|Platform 2
 
|-
 
|-
|colspan=2|{{RailRoute/6|2|BPLRT right|A|{{BP13}}|{{BP12}}|{{BP7}}|{{BP1}}}}
+
|colspan=2|{{Route/6|BPLRT|2|l|A|{{CurrentStn|BP13|l=}}|{{NextStn|BP12}}|{{NextStn|BP7}}|{{NextStn|BP1}}}}
 
|-
 
|-
|colspan=2|{{RailRoute/5|1|BPLRT left|B|{{BP1}}|{{BP6}}|{{BP13}}}}
+
|colspan=2|{{Route/5|BPLRT|1|r|B|{{NextStn|BP1}}|{{NextStn|BP6}}|{{CurrentStn|BP13|r=}}}}
 
|-
 
|-
 
|colspan=2 class="platform top"|Platform 1
 
|colspan=2 class="platform top"|Platform 1
Line 42: Line 46:
 
|}
 
|}
  
'''Notes''': Platform 2 will opens between start of operation and 9am and 5pm and 8pm on Weekdays except PH.
+
'''Notes''': Platform 2 will opens between start of operation and 9am and between 5pm and 8pm on weekdays except public holiday.
  
 
==Exits==
 
==Exits==
Line 58: Line 62:
 
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
 
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
 
|-
 
|-
!colspan=5 class="BPLRT" style="text-align:center;"|[[File:LRTFFF.png|20px|link=|alt=]] Bukit Panjang LRT
+
!colspan=5 style="{{CSS/BPLRT|nofg=|nobc=|bc=}}text-align:center;"|[[File:LRTFFF.png|20px|link=|alt=]] {{BPLRT|style={{CSS/BPLRT|nobg=|nofg=|nobc=|bc=}}}}
{{MRTTime|BPLRT|BP1|Choa Chu Kang|05:15|05:15|05:33|23:48}}
+
{{Timing|BP1||05:15|05:15|05:33|23:48|nv=}}
{{LRTTime|BPLRT|BP1|Choa Chu Kang|Petir|05:00|L=20:08}}
+
{{Timing|BP1|BP7|05:00|L=20:08}}
 
|}
 
|}
  

Latest revision as of 14:01, 27 July 2020


!
COVID-19 ADVISORY
!
In light of the current COVID-19, sgWiki would like to remind all to:
  • Keep good personal hygiene
  • Wear a mask when not at home unless participating in high strenuous exercise.
  • Visit a clinic if you develop cough, flu and/or fever. Contact the clinic beforehand if you suspected yourself to be infected with the virus.
  • Defer all travel abroad. Singaporeans, Permanent Residents, Long Term Pass holders entering Singapore will be issued a 14-day Stay-Home Notice (SHN).
  • Short-Term visitors are not allowed to enter in Singapore.
  • Observe the necessary Stay-Home Notice (SHN) or Quarantine Order (QO) protocols.
  • For more information, visit Ministry of Health (Singapore) website or World Health Organisation website.


!
TRAVEL ADVISORY
!
SBS Transit SMRT Buses
  • Due to Malaysia's Control Orders,
    • Bus services
      160
      and
      170
      are diverted to loop at Woodlands Centre Rd, skipping all stops in Malaysia.
    • Bus services
      170X
      and
      950
      are suspended.
  • Please refer here (SBS Transit) and here (SMRT Buses) for more information.

Land Transport Authority SBS Transit SMRT Buses:
  • Due to post COVID-19 "Circuit Breaker" measures, all Chinatown Direct, NightRider and Nite Owl bus services, as well as bus services
    188R
    ,
    401
    ,
    926
    and
    963R
    , are suspended. Please refer here for more information.

SMRT Buses
  • Due to Downtown Line (Stage 2) Bus Rationalisation (2020), from Sunday, 16 August 2020;
    • Bus service
      171
      will be shorten to loop at Bukit Panjang MRT/LRT. Affected commuters may take the Downtown Line instead.
    • Bus services
      700
      and
      700A
      will be withdrawn. Affected commuters may take the Downtown Line instead.
    • Bus services
      972
      will be amended to ply Newton MRT instead of Stevens Road. Affected commuters may take bus services
      105
      ,
      132
      or
      190
      instead.
  • Please refer here for more information.

Changi Airport Group Changi Airport Skytrain
  • Due to COVID-19, skytrain services are suspended except Public Service between T3 Station B and T1 Station C.
  • Due to renovation of Terminal 2, skytrain service between T2 Station E and T2 Station F is suspended.

SMRT Thomson–East Coast Line

SMRT Thomson–East Coast Line
  • Due to system integrating test, train services between TE1 Woodlands North and TE3 Woodlands South stations will start at 6.30am and will end at 9pm. Please refer here for more information.

BP13
Senja
信佳
சென்ஜா
Senja-BPLRT.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 90 Bukit Panjang Ring Road
Singapore 679942
Line(s) Bukit Panjang LRT
Structure Elevated
Connections Bus

Segar (BP11) is a Light Rail Transit (LRT) station on the Bukit Panjang LRT.

History

Date Event
6 November 1999 Station officially opened

2002 train disruption

On 21 October 2002, the entire Bukit Panjang LRT was shut down at 6.38am after a disruption caused by a dislodged train wheel, which led to the power system being crippled between Bukit Panjang and Senja stations. Partial LRT services only resumed at 6.30pm on 24 October 2002 and full services at 12pm on 26 October 2002.[1]

2015 train disruption

On 9 March 2015, during the evening peak hours, the Bukit Panjang LRT was suspended from service for a full 24 hours due to a power trip which was caused by a fire. The fire was caused due to a sudden power surge and the fuse box failed to handle the surge. Usually the fuse box will trip the system and activate safety measures, but on that day the fuse box failed to do so and instead burst into flames. The problem was identified as arcing problem which was why the power "jumped". The reason for how the fire started, however, is still a mystery to this day.[2]

Layout

L2
Platform 2
2Platform Service A: BP13
Senja
BP12
Jelapang
BP7
Petir
BP1NS4
Choa Chu Kang
1Platform Service B: BP1NS4
Choa Chu Kang
BP6=DT1
Bukit Panjang
BP13
Senja
Platform 1
L1 Concourse Faregates, Ticketing Machines
Street Level

Notes: Platform 2 will opens between start of operation and 9am and between 5pm and 8pm on weekdays except public holiday.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Bt Panjang Ring Rd, Senja Rd

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
Bukit Panjang LRT
BP1 Choa Chu Kang 05:15 05:15 05:33 23:48
BP1 Choa Chu Kang
   via BP7 Petir
05:00 20:08

Bus

Bus Stop Exit Bus Service
(44641) Blk 602 A
920
922
971E
972
976
(44649) Blk 541A CP A
920
922
971E
972
976

References

Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
Former: Ten Mile Junction
Rolling Stock C801C801AC801B
Depots Ten Mile Junction