Renjong station

From SgWiki
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SBS Transit North East Line: Train service between Serangoon and Punggol stations will end at 11pm due to track maintenance and upgrading works. Rail Bridging Service (Shuttle 21) are available during the early closure. Certain bus service will be extended to coincide with the last shuttle bus timing.
SMRT North South Line: Canberra MRT station will commence operation on 2 November 2019. Please refer here for more information.
SW8
Renjong
仁宗
ரெஞ்சோங்
Renjong-SKLRT.png
Statistics
Address 60 Sengkang East Avenue
Singapore 545049
Line(s) Sengkang LRT
Connections Bus

Renjong (SW8) is an elevated Light Rail Transit (LRT) station on the Sengkang LRT.

History

Date Event
29 January 2005 Station officially opens

Layout

L3 Platform 2
Service C: SW8
Renjong
STCNE16
Sengkang
Platform 1/2
Platform 1
Service D: STCNE16
Sengkang
SW1
Cheng Lim
SW8
Renjong
L2 Concourse Faregates, Ticketing Machines
L1 Street Level

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Sengkang East Avenue
B Handicapped/disabled access Sengkang East Avenue, Nan Chiau High School

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
Sengkang LRT
STC Sengkang 05:28 05:28 05:48 00:26
STC Sengkang
   via Cheng Lim
05:35 05:35 05:55 00:42

Bus

Bus Stop Exit Bus Service
(67299) Opp Blk 303B A
163
(67291) Blk 303B B
163

References


Sengkang LRT [ VTE ]
Stations Sengkang
East Loop: CompassvaleRumbiaBakauKangkarRanggung
West Loop: Cheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock C810C810A
Depots Sengkang