Difference between revisions of "Downtown Line Bridging Service"
Jump to navigation
Jump to search
m |
Themystery (talk | contribs) (→Operator(s): There is no full route bridging service for DTL. There is passing through bridging services at Chinatown, but will not go full route to Bukit Panjang or Expo.) |
||
Line 12: | Line 12: | ||
!Operator | !Operator | ||
|- | |- | ||
|{{DT1| |1}} – {{DT35| |1}} | |{{DT1| |1}} – {{DT19| |1}} | ||
|{{SBS Transit}} | |||
|- | |||
|{{DT19| |1}} – {{DT35| |1}} | |||
|{{SBS Transit}} | |{{SBS Transit}} | ||
|} | |} |
Revision as of 21:58, 2 June 2021
Notes
- This service will only ply at affected stations during rail disruption.
- This service may ply different route subject to traffic conditions.
- Distance below are based on rail distance in uni-direction.
- Any bus operators may operate the following services other than the main operator listed below.
Operator(s)
Sector | Operator |
---|---|
DT11Bukit Panjang – DT191Chinatown | Template:SBS Transit |
DT191Chinatown – DT351Expo | Template:SBS Transit |
Bukit Panjang to Expo[Show/Hide Route Details]
|
Expo to Bukit Panjang[Show/Hide Route Details]
|