Bugis station

From SgWiki
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Monday, 26 May 2025, bus service 671 will operate additional morning and evening trips. Please refer here for more information.

SBS Transit
  • From Sunday, 8 June 2025, bus service 135 will serve a new pair of bus stops along Haig Road. Please refer here for more information.
Bugis
武吉士
பூகிஸ்
EW12
DT14
Abbr: BGS
Address
EWL320 Victoria Street
Singapore 188045
DTL191 Rochor Road
Singapore 188476
Line(s) East–West Line
Downtown Line
Structure Underground
Connections
Bus
Taxi

Bugis (EW12/DT14) is a Mass Rapid Transit (MRT) station on the East–West Line and the Downtown Line. It was built by Nishimatsu Construction and Lum Chang Construction Joint Venture under Contract 301 for the East–West Line [1] [2] and Soletanche Bachy and Koh Brothers Eco Engineering Joint Venture under Contract 903 for the Downtown Line. [3]

Entrances/Exits

Exit Nearby Point of Interest
A
No Handicapped/disabled access
Victoria Street, Rochor Road
B
Victoria Street, Raffles Hospital
C
No Handicapped/disabled access
Bugis Junction, Bugis+
D
Tan Quee Lan Street, Guoco Midtown
E
No Handicapped/disabled access
DUO, Parkview Square
F

First/Last Train Timing

Train to
First Train Last Train
Weekday/Sat Sun/P.H. Daily
EWL
SMRT Trains
06:03 06:31 00:13
05:56 06:22 23:53
DTL
SBS Transit
06:03 06:32 00:22
DT35
05:57 06:17 00:00

Note: Please enquire at the Passenger Service Centre for train connections.

Layout

L1 Street Level Bugis Junction
B1 EWL Concourse Faregates, Ticketing Machines,
icon

Passenger Service Centre
, SimplyGo Ticket Office
DTL Concourse Faregates, Ticketing Machines,
icon

Passenger Service Centre
B2
APlatform
Service Map
EW12
DT14
Bugis
EW11
(2 mins)
Lavender
EW10
(5 mins)
Kallang
EW9
(7 mins)
Aljunied
EW8
CC9
(10 mins)
Paya Lebar
EW7
(12 mins)
Eunos
EW6
(14 mins)
Kembangan
EW5
(17 mins)
Bedok
EW4
CG
(20 mins)
Tanah Merah
EW3
(24 mins)
Simei
EW2
DT32
(27 mins)
Tampines
EW1
(30 mins)
Pasir Ris
CG1
DT35
(23 mins)
Expo
CG2
(29 mins)
Changi Airport
icon
icon
icon
icon

(
DTL
)
icon
icon

(
DTL
)
Platform A/B
icon
icon
icon
icon

(
DTL
)
icon
icon

(
DTL
)
BPlatform
Service Map
EW33
(56 mins)
Tuas Link
EW32
(54 mins)
Tuas West Road
EW31
(51 mins)
Tuas Crescent
EW30
(49 mins)
Gul Circle
EW29
(45 mins)
Joo Koon
EW28
(41 mins)
Pioneer
EW27
(39 mins)
Boon Lay
EW26
(36 mins)
Lakeside
EW25
(34 mins)
Chinese Garden
EW24
NS1
(31 mins)
Jurong East
EW23
(26 mins)
Clementi
EW22
(23 mins)
Dover
EW21
CC22
(21 mins)
Buona Vista
EW20
(19 mins)
Commonwealth
EW19
(17 mins)
Queenstown
EW18
(14 mins)
Redhill
EW17
(12 mins)
Tiong Bahru
EW16
NE3
TE17
(9 mins)
Outram Park
EW15
(6 mins)
Tanjong Pagar
EW14
NS26
(4 mins)
Raffles Place
EW13
NS25
(2 mins)
City Hall
EW12
DT14
Bugis
B3 Transfer Linkway between East–West Line Concourse & Downtown Line Platforms
B4 Service Level Restricted access
B5
APlatform
Service Map
DT14
EW12
Bugis
DT13
(2 mins)
Rochor
DT12
NE7
(4 mins)
Little India
DT11
NS21
(6 mins)
Newton
DT10
TE11
(9 mins)
Stevens
DT9
CC19
(11 mins)
Botanic Gardens
DT8
(14 mins)
Tan Kah Kee
DT7
(16 mins)
Sixth Avenue
DT6
(19 mins)
King Albert Park
DT5
(21 mins)
Beauty World
DT4
(24 mins)
Hume
DT3
(26 mins)
Hillview
DT2
(28 mins)
Cashew
DT1
BP6
(31 mins)
Bukit Panjang
icon
icon
icon
icon
icon

(
EWL
)
Platform A/B
icon
icon
icon
icon
icon

(
EWL
)
BPlatform
DT35
Service Map
DT35
CG1
(50 mins)
Expo
DT34
(48 mins)
Upper Changi
DT33
(44 mins)
Tampines East
DT32
EW2
(42 mins)
Tampines
DT31
(39 mins)
Tampines West
DT30
(36 mins)
Bedok Reservoir
DT29
(33 mins)
Bedok North
DT28
(31 mins)
Kaki Bukit
DT27
(29 mins)
Ubi
DT26
CC10
(26 mins)
MacPherson
DT25
(24 mins)
Mattar
DT24
(22 mins)
Geylang Bahru
DT23
(19 mins)
Bendemeer
DT22
(17 mins)
Jalan Besar
DT21
(15 mins)
Bencoolen
DT20
(12 mins)
Fort Canning
DT19
NE4
(10 mins)
Chinatown
DT18
(8 mins)
Telok Ayer
DT17
(7 mins)
Downtown
DT16
CE1
(5 mins)
Bayfront
DT15
CC4
(2 mins)
Promenade
DT14
EW12
Bugis

Schematic Track Diagram

East–West Line:

EW12
DT14
NS25
EW13
to Dhoby Ghaut
NS25
EW13

Downtown Line:

DT13
EW12
DT14
CC4
DT15
CC4
DT15

Bus Connections

Rail Disruption Guide

Bridging Service:

Bus Stop Exit Bus Service
icon
01113
Bugis Stn Exit A
Victoria St
A
icon
01059
Bugis Stn Exit B
Victoria St
B
icon
01112
Opp Bugis Stn Exit C
Victoria St
C
icon
01119
Aft Bugis Stn Exit C
Victoria St
C
icon
01139
Bugis Stn/Parkview Sq
Nth Bridge Rd
D
icon
01541
Bugis Stn Exit D
Rochor Rd
D


Artworks

Downtown Line: Ephemeral by Patrick Chia

This interactive piece prompts commuters to pay closer attention to their surroundings and look up from their mobile devices to engage with art. Coloured discs hidden behind the glass panels can only be spotted from certain angles by those who are curious enough to look.[4]

History

Date Event
4 November 1989 Station officially opened
31 July 2001 East–West Line’s station code changed from
E1
to
EW12
22 December 2013 Station interchanged with Downtown Line

Construction accident

On 18 July 2012, two Chinese workers died after a temporary scaffolding, about 4m high, used for the construction of the new Downtown Line station subway link roof slab gave way. The incident happened at about 6.50am. The eight other injured workers who were working on top of the structure, were sent to the nearby Raffles Hospital before rescuers arrived. They had minor injuries and five of them have since been discharged. Of the remaining three workers who were hospitalised, one suffered from abdominal and chest injuries, while another suffered a back injury and the last had a finger injury. Seven of the injured are from Bangladesh while the eighth is from China. Based on preliminary information gathered, the Ministry of Manpower (MOM) said that while the workers were pouring concrete, also known as the casting process, into the formwork when the structure supporting the formwork collapsed.[5][6][7]

References

  1. Bugis and Lavender Stations. Lum Chang.
  2. Nishimatsu Construction Co., Ltd (Completed civil engineering projects). SITCE.
  3. Bugis MRT. Koh Brothers Eco Engineering Limited.
  4. Art in Transit. Land Transport Authority.
  5. "Two dead, eight injured at MRT construction site". Channel NewsAsia (18 July 2012).
  6. "Two bodies recovered from MRT work site". Channel NewsAsia (18 July 2012).
  7. "MRT worksite accident: why scaffolding collapsed". Channel NewsAsia (18 July 2012).
icon
East–West Line
[ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link

Changi Airport ExtensionTanah MerahExpoChangi Airport

Rolling Stock 151151A151B151CR151

Former651751B

Depots ChangiUlu PandanTuasEast Coast
Others Bridging Service
icon
Downtown Line
[ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service