Difference between revisions of "Adtranz 801"

From SgWiki
Jump to navigation Jump to search
m (Supernutorcrazy moved page Adtranz C801 to Adtranz 801 without leaving a redirect)
 
(40 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{| class="toccolours" style="float: right; border-collapse: collapse; margin: 0em 1em;" border="1" cellpadding="2" cellspacing="0"
{{Infobox/Train
| colspan="2" style="text-align:center" | <big><strong>Bombardier Innovia APM 100</strong></big>
|Name=Adtranz C801
|Img=[[File:C801-Ext(1).png|center-left|160px]] [[File:C801-Int(1).png|center-right|160px]]
|Info1=
{{Infoline|In service|1999 – Present}}
{{Infoline|Manufacturer|Adtranz}}
{{Infoline|Origin|Pennsylvania, United States of America}}
{{Infoline|Constructed|1997 – 1999}}
{{Infoline|Number Built|19 cars (19 Trains)}}
|Info2=
{{Infoline|Body Construction|Aluminium}}
{{Infoline|Length|12.8 m}}
{{Infoline|Width|2.8 m}}
{{Infoline|Height|3.4 m}}
{{Infoline|Doors|2 m, 4 per car}}
{{Infoline|Maximum Speed|Design: 55 km/h<br>Service: 48 km/h}}
{{Infoline|Traction Control|Thyristor (Adtranz)}}
{{Infoline|Line Voltage|600V AC Third Rail}}
{{Infoline|Track Gauge|Central Guideway}}
}}
 
The '''Adtranz C801''' trains are the first generation of rolling stock for the {{BPLRT}}. These are rubber-tyred automated people move (APM) trains, also referred to as light rail vehicles (LRV), designed for small-scale automated guideway transit systems. The Adtranz C801 is based on the design of the Adtranz CX-100 model, which is currently known as Bombardier INNOVIA APM 100 after the acquisition of Adtranz and rebranding by Bombardier.
 
==History==
Contract 801 was awarded to the joint venture of ABB and Daimler-Benz, better known as Adtranz after the endorsement of the Light Rail Transit (LRT) system in 1996.
 
===Modification===
The C801 trains used to have LCD displays on each trains for advertising purposes, on top of the current LED display. These had since been deactivated and removed. All train cars were installed with solar windscreen to minimise heat and light from entering the trains after the successful experimental on 1 of the train car.
 
===Defects in the C801 rolling stock===
The C801 had suffered from cracks in 2015 during the routine assessment by Bombardier in 2015.<ref>[//www.straitstimes.com/singapore/transport/us-made-lrt-trains-also-had-cracks "US-made LRT trains also had cracks"]. Straits Times (8 July 2016)</ref> This was only made public in 2016, after the cracks from the [[Kawasaki Heavy Industries & CSR Qingdao Sifang 151A|KSF(A) trains]], which runs on the {{NSL|b=}} and {{EWL|b=}}, were made public. The main cause for such cracks found on the lateral beam of the under-frame, which was measured to be no larger than 12cm, were due to "normal wear and tear" and had since been repaired.
 
===Replacement===
In March 2018, the Land Transport Authority (LTA) awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> The contract includes the overhaul of the {{BPLRT|b=}} and the replacement of the C801 trains with the newer C801B trains.<ref>[//www.bombardier.com/en/media/newsList/details.bt_20180306_bombardier-wins-contract-to-upgrade-singapores-bukit.bombardiercom.html "Bombardier Wins Contract to Upgrade Singapore's Bukit Panjang Light Rail Transit Line"]. Bombardier. Retrieved on 28 July 2018.</ref>
 
==Design/Features==
{| class="toccolours" border=1 style="text-align:center;border-collapse:collapse;"
|-class="SMRT"
!class="LTA"|
!Initial
|-
|-
| colspan="2"| [[Image:SLRT.JPG|center|300px]]Arriving Bukit Panjang Station. Photo by SN Yuen.
!
|<div class="train">{{TrainCar|M|326982|only}}</div>
|-style="background-color:#DDD"
!colspan=2|Exterior Design
|-
|-
! In service
!style="text-align:left"|Livery
| 1990 - March 2006 (Changi Airport Skytrain)<br>6 November 1999 - Current ([[Bukit Panjang LRT]])
|Teal with red stripe (formerly Turquoise stripes)
|-
! Manufacturer
| Bombardier Transportation (Former Adtranz)
|-
|-
! Number built
!style="text-align:left"|Train Run Number
| Passenger service: 19 vehicle (19 trains)
|{{N/A}}
|-style="background-color:#DDD"
!colspan=2|Interior Design
|-
|-
! Capacity
!style="text-align:left"|Seating Capacity
| 105 passengers<br>22 seats
|16
|-
|-
! Operator
!style="text-align:left"|Wheelchair Bay
| SMRT Cooperation
|{{N/A}}
|-
|-
! Depot(s)
!style="text-align:left"|Door Closing Indicator Lights
| [[Ten Mile Junction Depot|Ten Mile]]
|{{N/A}}
|-style="background-color:#DDD"
!colspan=2|System
|-
|-
! Line(s) served
!style="text-align:left"|Safety System
| [[Bukit Panjang LRT]]<br>Former Changi Airport Skytrain
|ATC, ATO, ATP, ATS
|-
|-
| style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> 
!style="text-align:left"|Signalling System
|- 
|Fixed Block
! Car length
| 12.8 m
|-
|-
! Width
!style="text-align:left"|Traction Control
| 2.8 m
|Thyristor (Adtranz)
|-
! Height
| 3.4 m
|-
! Maximum speed
| 55 km/h (Design)<br>26 km/h (Average)
|-
! Weight
| 15000 kg
|-
! Gauge
| Central guideway with rubber tyres
|}
|}
The '''Bombardier Innovia APM 100''' (formerly known as the '''CX-100''') is an automated people mover (APM) rolling stock first developed by Adtranz (now Bombardier Transportation), intended mainly for airport connections and light rail in towns. They are operated by Automatic Train Control (ATC), making it fully automatic and driverless. 19 units are in service on the Bukit Panjang LRT, and more are formerly used on the Changi Airport Skytrain until March 2006.
These units (also referred to as vehicles) are rubber-tired, running on concrete tracks and are fitted with windows which turns near opaque within 6 metres of residential buildings.
During peak hours, these vehicles can be coupled in pairs. Morning peak hours usually see these coupled units serving Service B, while during the evening peak hours, such units are not specifically assigned a certain route.
The Innovia APM 100 began operations on the [[Bukit Panjang LRT]] in 1999. These cars are similar to the ones formerly used at Singapore Changi Airport’s Skytrainsystem in the early 1990s, jointly built by Westinghouse and Adtranz (acquired by Bombardier). Most of the new features available in newer MRT train cars are found here as well.


==Fleet==
==Fleet Numbering==
[[Bombardier Innovia APM 100 Fleet Info|APM 100 Fleet Info]]
The car numbers of the trains range from 101 to 119.


==Livery==
==References==
* Top: Current livery, a red strip runs around the vehicle.
<references/>
* Bottom: Previous original livery, two turquoise/green strip runs around the vehicle.
<br><br>
[[Image:Cx-100-livery-current.png|left|400px]]
[[Image:Cx-100-livery-old.png|left|400px]]
<br><br><br>
<br><br><br><br><br><br><br><br><br>


==Related Articles==
{{Light Rail Transit}}
{{Bukit Panjang LRT}}


*[[Trains]]
[[Category:Train Rolling Stock]]
*[[LRT Rolling Stock]]

Latest revision as of 17:38, 21 June 2023

Adtranz C801
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 1999 – Present
Manufacturer Adtranz
Origin Pennsylvania, United States of America
Constructed 1997 – 1999
Number Built 19 cars (19 Trains)
Statistics
Body Construction Aluminium
Length 12.8 m
Width 2.8 m
Height 3.4 m
Doors 2 m, 4 per car
Maximum Speed Design: 55 km/h
Service: 48 km/h
Traction Control Thyristor (Adtranz)
Line Voltage 600V AC Third Rail
Track Gauge Central Guideway

The Adtranz C801 trains are the first generation of rolling stock for the Bukit Panjang LRT. These are rubber-tyred automated people move (APM) trains, also referred to as light rail vehicles (LRV), designed for small-scale automated guideway transit systems. The Adtranz C801 is based on the design of the Adtranz CX-100 model, which is currently known as Bombardier INNOVIA APM 100 after the acquisition of Adtranz and rebranding by Bombardier.

History[edit]

Contract 801 was awarded to the joint venture of ABB and Daimler-Benz, better known as Adtranz after the endorsement of the Light Rail Transit (LRT) system in 1996.

Modification[edit]

The C801 trains used to have LCD displays on each trains for advertising purposes, on top of the current LED display. These had since been deactivated and removed. All train cars were installed with solar windscreen to minimise heat and light from entering the trains after the successful experimental on 1 of the train car.

Defects in the C801 rolling stock[edit]

The C801 had suffered from cracks in 2015 during the routine assessment by Bombardier in 2015.[1] This was only made public in 2016, after the cracks from the KSF(A) trains, which runs on the North–South Line and East–West Line, were made public. The main cause for such cracks found on the lateral beam of the under-frame, which was measured to be no larger than 12cm, were due to "normal wear and tear" and had since been repaired.

Replacement[edit]

In March 2018, the Land Transport Authority (LTA) awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million.[2] The contract includes the overhaul of the Bukit Panjang LRT and the replacement of the C801 trains with the newer C801B trains.[3]

Design/Features[edit]

Initial
M
Exterior Design
Livery Teal with red stripe (formerly Turquoise stripes)
Train Run Number N/A
Interior Design
Seating Capacity 16
Wheelchair Bay N/A
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control Thyristor (Adtranz)

Fleet Numbering[edit]

The car numbers of the trains range from 101 to 119.

References[edit]

  1. "US-made LRT trains also had cracks". Straits Times (8 July 2016)
  2. "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
  3. "Bombardier Wins Contract to Upgrade Singapore's Bukit Panjang Light Rail Transit Line". Bombardier. Retrieved on 28 July 2018.
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bridging Service