Difference between revisions of "Tanah Merah station"
m (Reverted edits by Thefoodie (talk) to last revision by Supernutorcrazy) |
m (→Bus) |
||
Line 81: | Line 81: | ||
|- valign=top | |- valign=top | ||
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service | !width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service | ||
{{BusGuide|85099|Tanah Merah Stn Exit A|A}}{{Bus|2| | {{BusGuide|85099|Tanah Merah Stn Exit A|A}}{{Bus|2|GAS}} {{Bus|9|SBST}} {{Bus|12|GAS}} {{Bus|12e|GAS}} {{Bus|14|SBST}} {{Bus|24|SBST}} {{Bus|31|SBST}} {{Bus|35|SBST}} {{Bus|35M|SBST}} {{Bus|38|SBST}} {{Bus|45|SBST}} {{Bus|47|SBST}} {{Bus|48|SBST}} | ||
{{BusGuide|85091|Tanah Merah Stn Exit B|B}}{{Bus|2| | {{BusGuide|85091|Tanah Merah Stn Exit B|B}}{{Bus|2|GAS}} {{Bus|9|SBST}} {{Bus|12|GAS}} {{Bus|12e|GAS}} {{Bus|14|SBST}} {{Bus|24|SBST}} {{Bus|31|SBST}} {{Bus|35|SBST}} {{Bus|35M|SBST}} {{Bus|38|SBST}} {{Bus|45|SBST}} {{Bus|47|SBST}} {{Bus|48|SBST}} {{Bus|NR7|SMRT}} | ||
|} | |} | ||
Revision as of 20:41, 24 March 2018
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
1 Tanah Merah 丹那美拉 தானா மேரா*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 920 New Upper Changi Road Singapore 467356 |
Line(s) | East–West Line |
Connections | Bus, Taxi |
Abbreviation | TNM |
Tanah Merah (EW4) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.
The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station is also the only MRT interchange station to have only one official alphanumeric symbol. However, to specify the separation of the extension with the main line, the code
will be used instead.
Similar to other stations on the eastern section of the East West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.
History
Date | Event |
---|---|
4 November 1989 | Station officially opens |
30 March 2011 | Half-Height Platform Screen Doors operates |
5 January 2013 | High Volume, Low Speed Blade fans operates |
Tanah Merah Modification Project
The Tanah Merah Modification Project (TMBP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airprot at a shorter intervals. Constructions will commence soon and is expected to be completed by 2024.[1]
Layout
L2 | Platform A | East–West Line Template:Terminus |
---|---|---|
Platform A/C | ||
Platform C/D | East–West Line Template:Terminus | |
Platform B/D | ||
Platform B | East–West Line Template:Terminus | |
L1 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre |
Street Level | ||
B1 | Underpass |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | New Upper Changi Road, APSN Katong School, Bedok View Secondary School | |
B | New Upper Changi Road |
Transport Services
Rail
Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service |}
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
85099 | Tanah Merah Stn Exit A |
|
85091 | Tanah Merah Stn Exit B |
References
- ↑ "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport". Land Transport Authority. Retrieved 25 August 2014.