Difference between revisions of "Tanah Merah station"
m (→Layout) |
m |
||
Line 12: | Line 12: | ||
'''Tanah Merah (EW4)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{EWL}}. | '''Tanah Merah (EW4)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{EWL}}. | ||
The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station | The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station may used the code <small>{{Code|2S|EWL|EW4|EWL|CG}}</small> instead to specify the separation of the extension with the main line. | ||
Similar to other stations on the eastern section of the [[East West Line]], the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station. | Similar to other stations on the eastern section of the [[East West Line]], the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station. | ||
==History== | ==History== | ||
{|class="wikitable mw-collapsible" style=" | {|class="wikitable mw-collapsible" style="width:50%" | ||
!width=150|Date!!Event | !width=150|Date!!Event | ||
|- | |- | ||
Line 32: | Line 31: | ||
The Tanah Merah Modification Project (TMBP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airprot at a shorter intervals. Constructions will commence soon and is expected to be completed by 2024.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=eaf97df7-016d-4a4d-9741-48310ac47112 "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport"]. Land Transport Authority. Retrieved 25 August 2014.</ref> | The Tanah Merah Modification Project (TMBP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airprot at a shorter intervals. Constructions will commence soon and is expected to be completed by 2024.<ref>[//app.lta.gov.sg/apps/news/page.aspx?c=2&id=eaf97df7-016d-4a4d-9741-48310ac47112 "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport"]. Land Transport Authority. Retrieved 25 August 2014.</ref> | ||
<div class='dual'> | |||
==Layout== | ==Layout== | ||
{| class="layout" | {| class="layout" | ||
!rowspan=5 valign=top|L2 | !rowspan=5 valign=top|L2 | ||
|Platform A||{{EWL}} | |Platform A||{{RailRoute/1|EWL|right|{{EW4}}|{{EW1}}}} | ||
|- | |- | ||
|colspan=2 class="platform"|Platform A/C | |colspan=2 class="platform"|Platform A/C | ||
|- | |- | ||
|Platform C/D||{{EWL}} | |Platform C/D||{{RailRoute/1|EWL|right|{{EW4}}|{{CG2}}}} | ||
|- | |- | ||
|colspan=2 class="platform"|Platform B/D | |colspan=2 class="platform"|Platform B/D | ||
|- | |- | ||
|Platform B||{{EWL}} | |Platform B||{{RailRoute/1|EWL|left|{{EW33}}|{{EW4}}}} | ||
|- valign=top | |- valign=top | ||
!width=25 rowspan=2|L1 | !width=25 rowspan=2|L1 | ||
|width=125|Concourse | |width=125|Concourse | ||
|Faregates, Ticketing Machines, Passenger Service Centre | |||
|- valign=top | |- valign=top | ||
|Street Level | |Street Level | ||
Line 57: | Line 56: | ||
| | | | ||
|} | |} | ||
</div> | |||
<div class='dual'> | |||
==Exits== | ==Exits== | ||
{|class="wikitable" style="text-align:center;" | |||
{|class="wikitable | |||
|- | |- | ||
!width=50|Exit!!width=50|Disabled-Access!!Location/Nearby | !width=50|Exit!!width=50|Disabled-Access!!Location/Nearby | ||
Line 69: | Line 67: | ||
|B||{{WAB}}||style="text-align:left;"|New Upper Changi Road | |B||{{WAB}}||style="text-align:left;"|New Upper Changi Road | ||
|} | |} | ||
</div> | |||
==Transport Services== | ==Transport Services== | ||
=== | ===First/Last Train Timing=== | ||
{ | {|class="traintiming" | ||
!rowspan=2 width=230|Destination!!colspan=3|First Train!!Last Train | |||
{{ | |-style="font-size:85%;" | ||
{{ | !width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily | ||
{{ | |- | ||
!colspan=5 class="EWL" style="text-align:center;"|[[File:MRTFFF.png|20px|link=|alt=]] East West Line | |||
{{MRTTime|EWL|EW1|Pasir Ris|05:16|05:16|05:42|00:31}} | |||
{{MRTTime|EWL|EW33|Tuas Link|05:36|05:36|06:02|23:31}} | |||
{{MRTTime|EWL|CG2|Changi Airport|05:20|05:20|05:47|23:50}} | |||
|} | |} | ||
Revision as of 13:48, 6 November 2018
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
1 Tanah Merah 丹那美拉 தானா மேரா*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 920 New Upper Changi Road Singapore 467356 |
Line(s) | East–West Line |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | TNM |
Tanah Merah (EW4) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.
The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. The station may used the code
instead to specify the separation of the extension with the main line.
Similar to other stations on the eastern section of the East West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.
History
Date | Event |
---|---|
4 November 1989 | Station officially opens |
30 March 2011 | Half-Height Platform Screen Doors operates |
5 January 2013 | High Volume, Low Speed Blade fans operates |
Tanah Merah Modification Project
The Tanah Merah Modification Project (TMBP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airprot at a shorter intervals. Constructions will commence soon and is expected to be completed by 2024.[1]
Layout
L2 | Platform A | Template:RailRoute/1 |
---|---|---|
Platform A/C | ||
Platform C/D | Template:RailRoute/1 | |
Platform B/D | ||
Platform B | Template:RailRoute/1 | |
L1 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre |
Street Level | ||
B1 | Underpass |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | New Upper Changi Road, APSN Katong School, Bedok View Secondary School | |
B | New Upper Changi Road |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png East West Line |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
85099 | Tanah Merah Stn Exit A |
|
85091 | Tanah Merah Stn Exit B |
References
- ↑ "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport". Land Transport Authority. Retrieved 25 August 2014.