Difference between revisions of "Bukit Batok station"

From SgWiki
Jump to navigation Jump to search
m
Line 12: Line 12:
'''Bukit Batok (NS2)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}}.
'''Bukit Batok (NS2)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}}.


{{ECLO|Type=Early Closure|Line=NSL|Start=15 May 2020|End=27 June 2020|NoteFirst=|NoteMore=}}
{{ECLO|Type=Early Closure|Line=NSL|Start=5 June 2020|End=27 June 2020|NoteFirst=|NoteMore=}}


==History==
==History==

Revision as of 20:09, 5 May 2020


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Bukit Batok
武吉巴督
புக்கிட் பாத்தோக்
Bukit Batok-NSL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Bukit Batok Central
Singapore 659958
Line(s) North–South Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation BBT

Bukit Batok (NS2) is an elevated Mass Rapid Transit (MRT) station on the North–South Line.

!
Note: This station is affected by the Early Closure of the North–South Line from 5 June 2020 to 27 June 2020. The last train will depart at 11pm on fridays and saturdays. There will be no train services on sundays.

History

Date Event
10 March 1990 Station officially opens

Layout

L2 Template:RailRoute/4
Platform A/B
Template:RailRoute/2
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Street Level Bukit Batok Bus Interchange, West Mall

Exits

Exit Disabled-Access Location/Nearby
A Bukit Batok Bus Interchange, Jurong-Clementi Town Council (Bukit Batok Branch Office)
B Handicapped/disabled access Bukit Batok Bus Interchange
C Handicapped/disabled access West Mall, Bukit Batok Community Library
D Handicapped/disabled access Bukit Batok Avenue 1

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png North South Line

Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime

Bus

Bus Stop Exit Bus Service
43009 Bt Batok Int
43411 Opp Blk 628
43419 Blk 628
43381 Blk 102
43389 Opp Blk 102

References


Template:North South Line