Bukit Panjang LRT

From SgWiki
Jump to navigation Jump to search

Template:Line Infobox

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.8 km long with 14 stations and it is fully automated. The project was contracted to Adtranz, Keppel Corporation and Gammon Construction.

History

Initial System
6 November 1999 Template:STN - Template:STN
10 December 2010 Service C was withdrawn due to redevelopment of Ten Mile Junction.
30 December 2011 Service C resumed its service after Junction 10 shopping mall was re-opened.

Stations

Alpha-Numeric
Code
Station Name Notes
Bukit Panjang LRT Line
2
Template:STN Terminus
Interchange with North–South Line
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
2
Template:STN Interchange with Downtown Line
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN
1
Template:STN Terminus

Services

Service Route Notes
A Template:STNTemplate:STNTemplate:STNTemplate:STN
B Template:STNTemplate:STNTemplate:STNTemplate:STN
C Template:STNTemplate:STNTemplate:STNTemplate:STN Operates only at selected timings.

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Ten Mile Junction station. The Ten Mile Junction Depot has maintenance and train overhaul facilities for trains along the Bukit Panjang LRT Line.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction

Template:Railway Lines in Singapore

icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bridging Service