!
|
TRAVEL ADVISORY
|
!
|
- From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.
- From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
- Please refer
- here for more information on the adjustments.
- here for Shuttle Bus and Train arrangements.
- here for the work map.
- From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.
- From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.
- From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
- Please refer to the following for more information.
- From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.
- From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.
|
1 Great World 大世界 கிரேட் வோர்ல்ட்*Graphic From SGTrains/Wikipedia/LTA
|
Statistics
|
Line(s)
|
Thomson–East Coast Line (Under Construction)
|
Great World (TE15) is a future underground Mass Rapid Transit (MRT) station on the Thomson–East Coast Line.[1]
History
Fibre Broadband Disruption
More than 500 fibre-broadband subscribers from all Internet Service Providers (ISPs) were cut off from the Internet on 12 June 2015 for more than 8 hours because of MRT construction work in Kim Seng Road. The Land Transport Authority apologies for the disruption as its Thomson East Coast Line contractor had damaged a section of NetLink Trust's fibre optic cables while carrying out piling works at the upcoming Great World station site.[2]
Construction Accident
A Bangladeshi construction worker was killed when the excavator's bucket was dislodged and fell on him on 19 December 2015 at about 5.30pm while the station is being constructed. The victim was guiding an excavator within the worksite when the bucket dislodged. He was taken to Singapore General Hospital and was pronounced dead on arrival. The reason is currently under investigation. No stop work order was given on the worksite.[3]
References
Template:Thomson East Coast Line