Difference between revisions of "Bahar Junction station"

From SgWiki
Jump to navigation Jump to search
m
m
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Infobox/Station
{{Infobox/Station
|Code={{Code/1|JS7|{{CSS/JRL|nobg=|fg=|bc=}}|dashed}}
|Code={{Code/F|JS7|JRL}}
|Name=Bahar Junction
|Name=Bahar Junction
|Info=
|Info=
  {{Infoline|Line(s)|{{JRL}}<br><small>''(Under Planning)}}
  {{Infoline|Line(s)|{{JRL}} <small>''(Future)}}
{{Infoline|Structure|Elevated}}
}}
}}


'''Bahar Junction (JS7)''' is a future elevated [[Mass Rapid Transit]] (MRT) station on the {{JRL}}.<ref>[https://www.channelnewsasia.com/news/singapore/jurong-region-line-mrt-stations-open-2026-10216126 "Jurong Region Line, Singapore's 7th MRT line, to open in phases from 2026"]. Fann Sim (Channel NewsAsia, 9 May 2018). Retrieved 10 May 2018.</ref>
'''Bahar Junction (JS7)''' is a future [[Mass Rapid Transit]] (MRT) station on the {{JRL}}<ref>[//www.lta.gov.sg/content/ltagov/en/upcoming_projects/rail_expansion/jurong_region_line.html "Jurong Region Line"]. Land Transport Authority.</ref>.


==References==
==References==

Latest revision as of 17:47, 28 July 2021


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

SBS Transit
  • From Monday, 27 May 2024, City Direct services
    671
    &
    672
    will operate additional morning & evening trips. Please refer here for more information.

SBS Transit
  • From Monday, 27 May 2024, The first bus timing for service
    27
    from the following bus stops will be brought forward on Weekdays to the following timings:
    • The first bus timing from Hougang Central Interchange will be brought forward to 0510hrs on Weekdays.
    • The first bus timing from Sengkang East Ave (B/S 67261 (Blk 203B)) will be brought forwards to 0500hrs on Weekdays.
  • Please refer here for more information.

Go-Ahead
  • From Monday, 27 May 2024, Express service
    43e
    will call at additional bus stops along Buangkok Drive and Airport Road to better serve commuters’ travel needs. The first bus during both morning and evening peak periods will be brought forward by 10 minutes, and frequency will be improved from 20 – 30 minutes to 15 – 20 minutes. Please refer here for more information

SBS Transit
  • From Monday, 27 May 2024, short trip services
    20A
    ,
    39A
    &
    39B
    will be introduced.
    • Short Trip
      20A
      will start from Simei St 1 (B/S 96139 (Blk 148)) and will terminate at Changi Sth Ave 1 (B/S 96301 (Expo Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
    • Short Trip
      39A
      will start from Pasir Ris Ctrl (B/S 77031 (Opp Pasir Ris Stn Exit B)) and will terminate at Jln Kayu (B/S 68119 (Aft Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during morning & evening peak hours.
    • Short Trip
      39B
      will start from Punggol Way (B/S 65439 (Blk 220C)) and will terminate at Pasir Ris Ctrl (B/S 77039 (Pasir Ris Stn Exit B)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
  • Please refer here for more information.

JS7
Bahar Junction*Graphic From SGTrains/Wikipedia/LTA
Statistics
Line(s) Jurong Region Line (Future)
Structure Elevated

Bahar Junction (JS7) is a future Mass Rapid Transit (MRT) station on the Jurong Region Line[1].

References[edit]

  1. "Jurong Region Line". Land Transport Authority.
icon Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West ExtensionBahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East ExtensionTengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock J151
Depots Tengah
Others Bridging Service