Jurong Region Line

From SgWiki
Jump to: navigation, search
!
NOTICE
!
To prevent multiple account abusers, any new users who vandalised/inserting false information will be banned indefinitely and the affected page locked permanently. Subsequent account created within 48 hours after any banned action will be banned indefinitely.

Please ensure that your username does not contain any existing username (case insensitive), bus/train model name/identification and/or any other offensive, profanity or insults to harass, scold, or mimic any of our existing users. Any such username will be banned indefinitely with talk page privilege revoked.


!
TRAVEL ADVISORY
!
sgWiki wishes all, Merry Christmas.
Train Service will be extended tonight. Certain bus services will be extended to coincide with the last train service. Please refer to Travel Advisory for more information.
North South Line: Due to track renewal works, train services between Jurong East and Woodlands stations will end at 11pm. Shuttle bus services are available. Certain bus services will be extended to coincide with the last shuttle bus timing.
East West Line: Due to track renewal works, train services between Buona Vista and Boon Lay stations will end at 11pm. Train service between Queenstown and Buona Vista will be operating at a longer frequency. Shuttle bus services are available between Buona Vista and Boon Lay stations. Certain bus services will be extended to coincide with the last shuttle bus timing.
East West Line: Due to track renewal works, train services between Bugis and Raffles Place stations will end at 11.30pm. Train service between Raffles Place and Outram Park will be operating at a longer frequency. Affected commuters may take the North South Line between City Hall and Raffles Place instead. Shuttle bus services are available between Bugis and Raffles Place stations. Certain bus services will be extended to coincide with the last shuttle bus timing.
SBS Transit: Bus Service 253, 255, 257, 400 and 402 will have operate at a lower frequency during off-peak hours. Affected commuters may try the on-demand bus service during these time.
SMRT Buses: Bus Service NR7 will not be in operation. Affected commuters may try the on-demand bus service from 11.30pm to 2pm.
SMRT Buses: From 16 December 2018, Choa Chu Kang Bus Interchange will be relocated to the new Choa Chu Kang Bus Interchange as to facilitate the construction of Jurong Region Line. Please refer here for more information.
Bukit Panjang LRT: From 13 January 2019, Ten Mile Junction station will be permanent closed. Please refer here for more information.
Jurong Region Line
裕廊区域线
ஜூரோங் பிராந்திய வரி
Statistics
Status Under Planning
Termini Choa Chu Kang
Jurong Pier
Peng Kang Hill
Pandan Reservoir
Stations 24
Line length 24 km

Jurong Region Line (JRL) will be the seventh Mass Rapid Transit line. The line will be 24 km long with 24 stations and is expected to begin service in 2026.[1]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
Jurong Region Line Stage 1
JS1
NS4
BP1
Choa Chu Kang Choa Chu Kang Terminus
Interchange with North South Line and Bukit Panjang LRT
JS2
Choa Chu Kang West Choa Chu Kang West
JS3
Tengah Tengah Terminus (Jurong East Extension)
JS4
Hong Kah Hong Kah
JS5
Corporation Corporation
JS6
Jurong West Jurong West
JS7
Bahar Junction Bahar Junction
JS8
EW27
Boon Lay Boon Lay Interchange with East West Line
Jurong Region Line Stage 3
JS9
Enterprise Enterprise
JS10
Tukang Tukang
JS11
Jurong Hill Jurong Hill
JS12
Jurong Pier Jurong Pier Terminus
Jurong West Extension Stage 1
JW1
Gek Poh Gek Poh
JW2
Tawas Tawas
Jurong West Extension Stage 3
JW3
Nanyang Gateway Nanyang Gateway
JW4
Nanyang Crescent Nanyang Crescent
JW5
Peng Kang Hill Peng Kang Hill Terminus
Jurong East Extension Stage 2
JE1
Tengah Plantation Tengah Plantation
JE2
Tengah Park Tengah Park
JE3
Bukit Batok West Bukit Batok West
JE4
Toh Guan Toh Guan
JE5
NS1
EW24
Jurong East Jurong East Interchange with North South Line and East West Line
JE6
Jurong Town Hall Jurong Town Hall
JE7
Pandan Reservoir Pandan Reservoir Terminus

References

  1. "Jurong Region Line, Singapore's 7th MRT line, to open in phases from 2026". Fann Sim (Channel NewsAsia, 9 May 2018). Retrieved 10 May 2018.
Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Current North South LineEast West LineNorth East LineCircle LineDowntown Line
Under Construction Thomson East Coast Line
Future Jurong Region LineCross Island Line
Rolling Stocks Current Kawasaki Heavy Industries C151Kawasaki Heavy Industries & CSR Qingdao Sifang C151AKawasaki Heavy Industries & CSR Qingdao Sifang C151BKawasaki Heavy Industries & CRRC Qingdao Sifang C151CSiemens C651Alstom Metropolis C751AKawasaki Heavy Industries & Nippon Sharyo C751BAlstom Metropolis C751CAlstom Metropolis C830Alstom Metropolis C830CBombardier MOVIA C951
Future Kawasaki Heavy Industries & CRRC Qingdao Sifang CT251 • Alstom Metropolis C851E
Depots Current BishanChangiGali BatuKim ChuanSengkangUlu PandanTuas
Under Construction MandaiEast Coast
Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West Extension: Bahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East Extension: TengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir