Difference between revisions of "Rail Bridging Services"

From SgWiki
Jump to navigation Jump to search
m
m (Protected "Rail Bridging Services" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
(No difference)

Revision as of 17:04, 27 May 2019


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT

Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SMRT Buses
  • From Monday, 18 March 2024, supplementary bus service
    983M
    will be introduced, plying from Choa Chu Kang Road and terminating at Teck Whye Crescent (B/S 44969 (Aft Teck Whye Walk)). This service operates only on weekday mornings, except school and public holidays.

Please refer here for more information.


SBS Transit
  • From Sunday, 24 March 2024, bus services
    141
    and
    235
    will call at a new bus stop along Toa Payoh Rise, in front of Blk 131B (B/S 51199). Please refer here for more information.


SBS Transit
  • From Monday, 25 March 2024, the first bus timings of bus service
    50
    from B/S 65321 (Kadaloor Stn Exit B) will be brought forward on Weekdays (except Public Holidays). Please refer here for more information.

SBS Transit
  • From Sunday, 24 March 2024, bus services
    182
    and
    182M
    will call at a new bus stop along Jalan Ahmad Ibrahim, in front of the Singapore Rail Test Centre (B/S 25251). Please refer here for more information.

SMRT Buses
  • From Monday, 8 April 2024, bus service
    902
    will be revised to operate between 0745 hrs and 0915 hrs. Please refer here for more information.
Rail Bridging Services
列车接途巴士服务
Statistics
Operator(s) SBS Transit
SMRT Buses
Template:Tower Transit Singapore
Template:Go-Ahead Singapore
Bus Fleet Any Buses

Rail Bridging Services, also known as MRT/LRT Shuttle, will be activated when there is a disruption of train service. Free Travel to all commuters are only available during unplanned (ad-hoc) disruption.

Shuttle 1

Operator Year Date Service changes
SBS Transit
Template:Go-Ahead Singapore
2017 8 Dec Introduced between Outram Park and Jurong East station for Early Closure, Late Opening and Full Day Closure of the East–West Line.
(Towards Jurong East): Eu Tong Sen St, Outram Rd, Tiong Bahru Rd, Leng Kee Rd, C'wealth Ave, Nth Buona Vista Rd, Dover Rd, Dover Ave, C'wealth Ave West, Boon Lay Way, Jurong Gateway Rd
(Towards Outram Park): Jurong Gateway Rd, Boon Lay Way, C'wealth Ave West, Dover Ave, Dover Rd, Nth Buona Vista Rd, C'wealth Ave, Alexandra Rd, Tiong Bahru Rd, Outram Rd
2018 1 Jan Withdrawn.
SMRT Buses
Template:Tower Transit Singapore
Template:Go-Ahead Singapore
2 Mar Re-introduced between Raffles Place and Buona Vista station for Early Closure and Late Opening of the East–West Line.
(Towards Buona Vista): Marina Blvd, Bayfront Ave, Central Blvd, Shenton Way, Keppel Rd, Cantonment Link, Cantonment Rd, Neil Rd, Eu Tong Sen St, Outram Rd, Tiong Bahru Rd, Leng Kee Rd, C'wealth Ave, Nth Buona Vista Rd
(Towards Raffles Place): Nth Buona Vista Rd, C'wealth Ave, Alexandra Rd, Tiong Bahru Rd, Outram Rd, Cantonment Rd, Keppel Rd, Anson Rd, Marina Blvd
30 Apr Withdrawn.
SMRT Buses 5 Oct Re-introduced between Outram Park and Jurong East station for Early Closure of the East–West Line.
(Towards Jurong East): Eu Tong Sen St, Outram Rd, Tiong Bahru Rd, Leng Kee Rd, C'wealth Ave, Nth Buona Vista Rd, Dover Rd, Dover Ave, C'wealth Ave West, Boon Lay Way, Jurong Gateway Rd
(Towards Outram Park): Jurong Gateway Rd, Boon Lay Way, C'wealth Ave West, Dover Ave, Dover Rd, Nth Buona Vista Rd, C'wealth Ave, Alexandra Rd, Tiong Bahru Rd, Outram Rd
5 Oct Calls at Pick-up/Drop off Point @ Buona Vista Exit D instead of 11369 - Buona Vista Stn Exit D.
28 Oct Withdrawn.

Shuttle 6

DIRECTION 1
Dist
(km)
Road Bus Stop Station
0.0 New Upp Changi Rd 85099 – Tanah Merah Stn Exit A
1
Tanah Merah
1.9 New Upp Changi Rd 84039 – Bedok Stn Exit A
1
Bedok
3.9 Changi Rd 83059 – Mjd Kassim
1
Kembangan
5.0 Eunos Rd 2 82009 – Eunos Int (Berth B6)
1
Eunos
6.1 Paya Lebar Rd 81119 – Paya Lebar Stn Exit C
1
Paya Lebar
Geylang East Ctrl Express
7.3 Aljunied Rd 81089 – Aljunied Stn
1
Aljunied
8.7 Geylang Rd 80039 – Opp Lor 1 Geylang Ter
1
Kallang
9.8 Kallang Rd 01319 – Lavender Stn Exit A/ICA
1
Lavender
10.9 Victoria St 01059 – Bugis Stn Exit B
1
Bugis
DIRECTION 2
Dist
(km)
Road Bus Stop Station
0.0 Victoria St 01113 – Bugis Stn Exit A
1
Bugis
1.1 Kallang Rd 01311 – Lavender Stn Exit B
1
Lavender
2.2 Sims Ave 80031 – Kallang Stn
1
Kallang
3.6 Aljunied Rd 81081 – Opp Aljunied Stn
1
Aljunied
Geylang East Ctrl Express
4.8 Paya Lebar Rd 81111 – Paya Lebar Stn Exit B
1
Paya Lebar
5.9 Sims Ave 82061 – Eunos Stn/Int
1
Eunos
7.0 Sims Ave East 83062 – Kembangan Stn
1
Kembangan
9.0 New Upp Changi Rd 84031 – Bedok Stn Exit B
1
Bedok
10.9 New Upp Changi Rd 85091 – Tanah Merah Stn Exit B
1
Tanah Merah
Operator Year Date Service changes
SBS Transit 2018 2 Mar Introduced between Paya Lebar and Bugis station for Early Closure and Late Opening of the East–West Line.
(Towards Bugis): Paya Lebar Rd, Geylang East Ctrl, Aljunied Rd, Geylang Rd, Kallang Rd, Victoria St
(Towards Paya Lebar): Victoria St, Kallang Rd, Sims Ave, Aljunied Rd, Geylang East Ctrl, Paya Lebar Rd
7 Mar Extended to Raffles Place station.
(Towards Raffles Place): Paya Lebar Rd, Geylang East Ctrl, Aljunied Rd, Geylang Rd, Kallang Rd, Victoria St, Middle Rd, Nth Bridge Rd, Marina Blvd
(Towards Paya Lebar): Marina Blvd, Bayfront Ave, Raffles Ave, Stamford Rd, Victoria St, Kallang Rd, Sims Ave, Aljunied Rd, Geylang East Ctrl, Paya Lebar Rd
30 Apr Withdrawn.
SMRT Buses 2019 4 Jan Re-introduced between Bugis and Raffles Place station for Early Closure of the East–West Line.
(Towards Raffles Place): Victoria St, Middle Rd, Nth Bridge Rd, Marina Blvd
(Towards Bugis): Marina Blvd, Bayfront Ave, Raffles Ave, Stamford Rd, Victoria St
13 Jan Withdrawn.
SMRT Buses
Template:Go-Ahead Singapore
3 May Re-introduced between Tanah Merah and Bugis station for Early Closure of the East–West Line.
(Towards Bugis): New Upp Changi Rd, Changi Rd, Eunos Rd 2, Paya Lebar Rd, Geylang East Ctrl, Aljunied Rd, Geylang Rd, Kallang Rd, Victoria St
(Towards Tanah Merah): Victoria St, Kallang Rd, Sims Ave, Aljunied Rd, Geylang East Ctrl, Paya Lebar Rd, Sims Ave, Sims Ave East, New Upp Changi Rd
30 Jun To be withdrawn.

Shuttle 10

Operator Year Date Service changes
SMRT Buses
Template:Tower Transit Singapore
Template:Go-Ahead Singapore
2018 1 Jun Introduced between Woodlands and Ang Mo Kio station for Early Closure and Late Opening of the North–South Line.
Woodlands Sq, Woodlands Ave 7, Sembawang Way, Canberra Link, Yishun Ave 2, Lentor Ave, Ang Mo Kio Ave 6, Ang Mo Kio Ave 8
2 Jul Withdrawn.
SBS Transit
SMRT Buses
2019 18 May Re-introduced between Woodlands and Yishun station for Full Day Closure of the North–South Line.
Woodlands Sq, Woodlands Ave 7, Sembawang Way, Canberra Link, Yishun Ave 2
Calls at Bus Stop 59671 - Bef Yishun Stn instead of 59079 - Yishun Stn.
20 May Extended to Ang Mo Kio station for Full Day Closure of the North–South Line.
Woodlands Sq, Woodlands Ave 7, Sembawang Way, Canberra Link, Yishun Ave 2, Lentor Ave, Ang Mo Kio Ave 6, Ang Mo Kio Ave 8
21 May Withdrawn.

Express 17

Operator Year Date Service changes
SMRT Buses 2018 1 Jun Introduced between Woodlands and Bukit Panjang station for Early Closure and Late Opening of the North–South Line.
(Towards Bukit Panjang): Woodlands Sq, Woodlands Abe 3, BKE, Bt Panjang Rd, Upp Bt Timah Rd
(Towards Woodlands): Upp Bt Timah Rd, Petir Rd, Bt Panjang Ring Rd, Bt Panjang Rd, BKE, Woodlands Ave 3, Woodlands Sq
2 Jul Withdrawn.
30 Nov Re-introduced between Woodlands and Bukit Panjang station for Early Closure of the North–South Line.
No Route Changes
16 Dec Withdrawn.
2019 18 May Re-introduced between Woodlands and Bukit Panjang station for Full Day Closure of the North–South Line.
No Route Changes
21 May Withdrawn.

Bridging Service