Difference between revisions of "Bombardier Innovia 801A"

From SgWiki
Jump to navigation Jump to search
m
Line 1: Line 1:
{{Infobox/Train
{{Infobox/Train
|Name=Bombardier INNOVIA C801A
|Name=Bombardier INNOVIA C801
|Img=[[File:C801A.jpg|center|300px]]Exterior of a coupled C801A train.
|Img=[[File:C801A-Ext.png|center-left|160px]] [[File:C801A-Int.png|center-right|160px]]
|Info1=
|Info1=
  {{Infoline|In service|2014 – Present}}
  {{Infoline|In service|2014 – Present}}
Line 21: Line 21:


'''Bombardier INNOVIA C801A''' are the second generation of trains running on the {{BPLRT}}.
'''Bombardier INNOVIA C801A''' are the second generation of trains running on the {{BPLRT}}.
==History==
On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. <ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=596bf603-1252-47ac-8ae9-e8e2f2a7f733 "Award of Contract to Renew the Bukit Panjang LRT System"]. Land Transport Authority. Retrieved 28 July 2018.</ref> Under the contract, all of the 19 C801A trains would be retrofitted with the new signalling system by 2022.


==Design/Features==
==Design/Features==
Line 29: Line 32:
|-
|-
!
!
|<div class="train">{{TrainCar|M|1E3C96|left right}}</div>
|<div class="train">{{TrainCar|M|97B727|only}}</div>
|-style="background-color:#DDD"
|-style="background-color:#DDD"
!colspan=2|Exterior Design
!colspan=2|Exterior Design

Revision as of 08:07, 6 June 2020

Bombardier INNOVIA C801
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2014 – Present
Manufacturer Bombardier Transportation
Origin Pennsylvania, United States of America
Constructed 2014 – 2015
Number Built 13 cars (13 Trains)
Statistics
Body Construction Aluminum
Length 12.8 m
Width 2.8 m
Height 3.4 m
Doors 2 m, 4 per car
Maximum Speed Design: 55 km/h
Service: 48 km/h
Traction Control Thyristor (Bombardier)
Line Voltage 600V AC Third Rail
Track Gauge Central Guideway

Bombardier INNOVIA C801A are the second generation of trains running on the Bukit Panjang LRT.

History

On 7 March 2018, the Land Transport Authority awarded the contract for renewing the Bukit Panjang LRT system to Bombardier at a cost of $344 million. [1] Under the contract, all of the 19 C801A trains would be retrofitted with the new signalling system by 2022.

Design/Features

Initial
M
Exterior Design
Livery Grey with Yellow, Red, Black stripes & pixels
Train Run Number N/A
Interior Design
Seating Capacity 22
Wheelchair Bay 1
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control Thyristor (Bombardier)

Fleet Numbering

The car numbers of the trains range from 120 to 132.

References

  1. "Award of Contract to Renew the Bukit Panjang LRT System". Land Transport Authority. Retrieved 28 July 2018.
icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bridging Service