Difference between revisions of "Gul Circle station"
Jump to navigation
Jump to search
m |
m (→History) |
||
Line 24: | Line 24: | ||
|16 November 2017 - 19 November 2017||Station closed due to the {{Stn|Joo Koon}} train collision<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/11/2/joint-statement-by-the-land-transport-authority-lta-smrt---joo-koon-train-incident.html "Joint Statement by the Land Transport Authority (LTA) & SMRT - Joo Koon train incident"]. Land Transport Authority (15 November 2017).</ref> | |16 November 2017 - 19 November 2017||Station closed due to the {{Stn|Joo Koon}} train collision<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/11/2/joint-statement-by-the-land-transport-authority-lta-smrt---joo-koon-train-incident.html "Joint Statement by the Land Transport Authority (LTA) & SMRT - Joo Koon train incident"]. Land Transport Authority (15 November 2017).</ref> | ||
|- | |- | ||
|20 November 2017 - 26 May 2018||Station (towards {{Stn|Pasir Ris}}) closed due to the {{Stn|Joo Koon}} train collision<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/11/2/update-on-train-services-on-tuas-west-extension.html "Update on Train Services on Tuas West Extension"]. Land Transport Authority (16 November 2017).</ref><br><small>''(Except 10 | |20 November 2017 - 26 May 2018||Station (towards {{Stn|Pasir Ris}}) closed due to the {{Stn|Joo Koon}} train collision<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/11/2/update-on-train-services-on-tuas-west-extension.html "Update on Train Services on Tuas West Extension"]. Land Transport Authority (16 November 2017).</ref><br><small>''(Except 10, 17 December 2017, 29 April 2018 and 6, 13, 20 May 2018) | ||
|- | |- | ||
|10, 17 December 2017||Station closed due to the upgrading of signaling system on the {{EWL}}<ref>[//www.channelnewsasia.com/news/singapore/2-full-day-shutdowns-shorter-operating-hours-for-19-nsewl-mrt-9425326 "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT"]. Channel NewsAsia (21 November 2017).</ref> | |10, 17 December 2017||Station closed due to the upgrading of signaling system on the {{EWL}}<ref>[//www.channelnewsasia.com/news/singapore/2-full-day-shutdowns-shorter-operating-hours-for-19-nsewl-mrt-9425326 "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT"]. Channel NewsAsia (21 November 2017).</ref> |
Revision as of 08:13, 3 March 2021
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
|
Template:Code/1 Gul Circle 卡尔圈 கல் சர்க்கல்*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 7A Tuas Road Singapore 637288 |
Line(s) | East–West Line |
Structure | Elevated |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | GCL |
Gul Circle (EW30) is a Mass Rapid Transit (MRT) station on the East–West Line. It is the tallest station with a height of 33m above ground level.[1]
!
|
Note: This station is affected by the Full Closure of the East–West Line from 14 March 2021 to 23 May 2021. There will be no train services on sundays. |
---|
History
Date | Event |
---|---|
18 June 2017 | Station officially opened |
16 November 2017 - 19 November 2017 | Station closed due to the Joo Koon train collision[2] |
20 November 2017 - 26 May 2018 | Station (towards Pasir Ris) closed due to the Joo Koon train collision[3] (Except 10, 17 December 2017, 29 April 2018 and 6, 13, 20 May 2018) |
10, 17 December 2017 | Station closed due to the upgrading of signaling system on the East–West Line[4] |
14, 21, 28 March 2021 | Station closed due to the replacement of electrical cable on the East–West Line[5] |
4, 11, 18, 25 April 2021 | |
2, 9, 16, 23 May 2021 |
Layout
L4 | Template:Route/1 | |
---|---|---|
Platform B/D | ||
Template:Route/0 | ||
L3 | Template:Route/3 | |
Platform A/C | ||
Template:Route/0 | ||
L2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre |
L1 | Street Level |
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Tuas Road, Tuas Fire Station | |
B | Tuas Road, Tuas Avenue 3 |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png East–West Line | ||||
EW1Pasir Ris | 05:26 | 05:26 | 05:56 | 23:26 |
EW33Tuas Link | 05:30 | 05:30 | 06:00 | 00:41 |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
24511 | Gul Circle Stn Exit A |
|
24519 | Gul Circle Stn Exit B |
References
- ↑ "MRT Tuas West Extension to soar above the ground". Christopher Tan (Straits Times, 3 February 2015).
- ↑ "Joint Statement by the Land Transport Authority (LTA) & SMRT - Joo Koon train incident". Land Transport Authority (15 November 2017).
- ↑ "Update on Train Services on Tuas West Extension". Land Transport Authority (16 November 2017).
- ↑ "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT". Channel NewsAsia (21 November 2017).
- ↑ "Selected East-West Line MRT stations to close on Sundays for cable replacement works". Channel NewsAsia (2 March 2021).