|
|
Line 29: |
Line 29: |
|
| |
|
| ==Layout== | | ==Layout== |
| {| style="border-collapse:collapse;border-top:1px solid #888;border-bottom:1px solid #888;" | | {{:Changi Airport Station/Layout}} |
| |- valign=top
| |
| !L2
| |
| |Departure Hall
| |
| |[[Changi Airport Skytrain]]
| |
| |- style="border-top:1px solid #888;" valign=top
| |
| !rowspan=2|L1
| |
| |Arrival Hall
| |
| |
| |
| |- style="border-top:1px solid #888;" valign=top
| |
| |Street Level
| |
| |Changi Airport
| |
| |- style="border-top:1px solid #888;" valign=top
| |
| !B1
| |
| |Link Bridge
| |
| |Changi Airport PTB Bus Terminal, Link bridge between Terminal 2 and 3
| |
| |- style="border-top:1px solid #888;" valign=top
| |
| !width=25 rowspan=4|B2
| |
| |width=125|Concourse
| |
| |width=500|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
| |
| |- style="border-top:1px solid #888;"
| |
| |Platform A||{{EWL}}<br>{{Terminus|EWL|5|←}}
| |
| |-
| |
| |colspan=2 style="border:2px solid;text-align:center;"|Platform A/B
| |
| |-
| |
| |Platform B||{{EWL}}<br>{{Terminus|EWL|5|←}}
| |
| |}
| |
| | |
| ==Exits==
| |
| {|class="wikitable mw-collapsible" style="border-collapse:collapsed;text-align:center;width:50%"
| |
| |-
| |
| !width=50|Exit!!width=50|Disabled-Access!!Location/Nearby
| |
| |-
| |
| |A||{{WAB}}||style="text-align:left;"|Changi Airport Terminal 2
| |
| |-
| |
| |B||{{WAB}}||style="text-align:left;"|Changi Airport Terminal 3
| |
| |}
| |
|
| |
|
| ==Transport Services== | | ==Transport Services== |
Revision as of 11:40, 5 March 2018
!
|
TRAVEL ADVISORY
|
!
|
- Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between these stations on Friday, 21 June 2024. Please refer here for more information.
- To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.
- From Sunday, 23 June 2024, Services
84G & 84W will be introduced to serve Punggol Way and New Punggol Rd in both directions. Please refer here for more information.
- From Monday, 24 June 2024, short trip services
86A & 86B will be introduced.
- Short Trip
86A will start from Jln Kayu (B/S 68119 (Aft Seletar Camp G)) and will terminate at Ang Mo Kio Ave 6 (B/S 55189 (Yio Chu Kang Stn)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
- Short Trip
86B will start from Ang Mo Kio Ave 6 (B/S 55181 (Opp Yio Chu Kang Stn)) and will terminate at Jln Kayu (B/S 68111 (Bef Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during evening peak hours.
- Please refer here for more information.
- From 30 June 2024 to 21 July 2024, train services on the North East Line will start later at 8am on Sundays. This is to facilitate the integrated testing of systems for the opening of the new Punggol Coast Station. Please refer here
- From Sunday, 14 July 2024, Service
410G will be amended to ply Bishan St 23, calling at new bus stop in front of Blk 228 (53439). In addition, it will also start earlier at 5:25am on weekdays and 5:40am on weekends and public holidays from the bus stop at Blk 454 Sin Ming Ave (53369). Please refer here for more information.
|
Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.
History
Date |
Event
|
8 February 2002 |
Station officially opens
|
Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.
Station Planning
The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.
The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.
Layout
Changi Airport Station/Layout
Transport Services
Rail
Template:Rail Head
Template:Rail Line
Template:Rail Service
|}
Notes: Last connecting train to Tuas Link will depart at 23:18.
Bus
Changi Airport Station/Alternate Bus Service
References
Template:Singapore MRT stations
Template:East West Line