Difference between revisions of "Changi Airport station"

From SgWiki
Jump to navigation Jump to search
Line 47: Line 47:
|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|-
|-
|Platform A||{{RailRoute/1|EWL|left|{{EW4}}|{{CG1}}|{{CG2}}}}
|Platform A||{{RailRoute/1|EWL|left|{{CG}}|{{CG1}}|{{CG2}}}}
|-
|-
|colspan=2 class="platform"|Platform A/B
|colspan=2 class="platform"|Platform A/B
|-
|-
|Platform B||{{RailRoute/1|EWL|left|{{EW4}}|{{CG1}}|{{CG2}}}}
|Platform B||{{RailRoute/1|EWL|left|{{CG}}|{{CG1}}|{{CG2}}}}
|}
|}



Revision as of 15:12, 10 March 2020


!
TRAVEL ADVISORY
!
SBS Transit
  • From Monday, 30 September 2024, short trip
    50A
    will be introduced from Punggol East to Ang Mo Kio Avenue 8, operating on weekdays excluding public holidays during the morning peak period. Please refer here for more information.

1

Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png Changi Airport Skytrain Airport
Abbreviation CGA

Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opens

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.

Station Planning

The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.

The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.

Layout

L3 Linkbridge to Jewel
Viewing Gallery
L2 Departure Hall Changi Airport, Changi Airport Skytrain
L1 Arrival Hall Changi Airport
M Linkbridge
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Platform A Template:RailRoute/1
Platform A/B
Platform B Template:RailRoute/1

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2, Jewel, Changi Airport Skytrain
B Handicapped/disabled access Changi Airport Terminal 3, Jewel, Changi Airport Skytrain

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line

Template:MRTTime

Bus

Bus Stop Exit Bus Service
95129 Changi Airport PTB2
24
27
34
36
53
110
858
95109 Changi Airport PTB3
24
27
34
36
53
110
858

References


Template:East West Line