Difference between revisions of "Jurong East station"
m |
m |
||
Line 26: | Line 26: | ||
The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the [[North South Line]] to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.<ref>[//app.lta.gov.sg/corp_press_content.asp?start=1964 "The Jurong East Modification Project (JEMP)"]. Land Transport Authority.</ref> | The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the [[North South Line]] to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.<ref>[//app.lta.gov.sg/corp_press_content.asp?start=1964 "The Jurong East Modification Project (JEMP)"]. Land Transport Authority.</ref> | ||
==Layout== | ==Layout== | ||
{| class="layout" | {| class="layout" | ||
Line 54: | Line 53: | ||
'''Notes''': Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH. | '''Notes''': Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH. | ||
==Exits== | ==Exits== | ||
{|class="wikitable" style="text-align:center;" | {|class="wikitable" style="text-align:center;" | ||
!width=50|Exit!!width=50|Disabled-Access!!Location/Nearby | !width=50|Exit!!width=50|Disabled-Access!!Location/Nearby | ||
|- | |- | ||
Line 69: | Line 66: | ||
|D||{{WAB}}||style="text-align:left;"|Westgate | |D||{{WAB}}||style="text-align:left;"|Westgate | ||
|} | |} | ||
==Transport Services== | ==Transport Services== | ||
Line 90: | Line 86: | ||
===Bus=== | ===Bus=== | ||
{|class="wikitable" | {|class="wikitable" | ||
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service | !width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service | ||
{{BusGuide|28009|Jurong East Temp Int|A}}{{Bus|41|TTS}} {{Bus|49|TTS}} {{Bus|51|SBST}} {{Bus|52|SBST}} {{Bus|66|TTS}} {{Bus|78|TTS}} {{Bus|79|TTS}} {{Bus|97|TTS}} {{Bus|97e|TTS}} {{Bus|98|TTS}} {{Bus|98M|TTS}} {{Bus|105|SBST}} {{Bus|143|TTS}} {{Bus|143M|TTS}} {{Bus|160|SBST}} {{Bus|183|TTS}} {{Bus|197|SBST}} {{Bus|333|TTS}} {{Bus|334|TTS}} {{Bus|335|TTS}} {{Bus|506|SBST}} | {{BusGuide|28009|Jurong East Temp Int|A}}{{Bus|41|TTS}} {{Bus|49|TTS}} {{Bus|51|SBST}} {{Bus|52|SBST}} {{Bus|66|TTS}} {{Bus|78|TTS}} {{Bus|79|TTS}} {{Bus|97|TTS}} {{Bus|97e|TTS}} {{Bus|98|TTS}} {{Bus|98M|TTS}} {{Bus|105|SBST}} {{Bus|143|TTS}} {{Bus|143M|TTS}} {{Bus|160|SBST}} {{Bus|183|TTS}} {{Bus|197|SBST}} {{Bus|333|TTS}} {{Bus|334|TTS}} {{Bus|335|TTS}} {{Bus|506|SBST}} |
Revision as of 17:32, 6 November 2018
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
3 Jurong East 裕廊东 ஜூரோங் கிழக்கு*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 10 Jurong East Street 12 Singapore 609690 |
Line(s) | North–South Line East–West Line Jurong Region Line (Future) |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | JUR |
Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North–South Line, the East–West Line and the future Jurong Region Line.
History
Date | Event |
---|---|
5 November 1988 | Station officially opens |
10 March 1990 | Station interchanges with North South Line (then East West Line Branch Extension) |
27 May 2011 | Jurong East Modification Project opens[1][2] |
Jurong East Modification Project
The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[3]
Layout
L3 | Platform A | Template:RailRoute/2 |
---|---|---|
Platform A/B | ||
Platform B/C | Template:RailRoute/3 | |
Platform C/D | ||
Platform D/E | Template:RailRoute/2 | |
Platform E/F | ||
Platform F | Template:RailRoute/1 | |
L2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office |
L1 | Street Level | Jurong East Bus Interchange |
Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall | |
B | Venture Avenue, Jurong Gateway Road | |
C | JEM, Big Box | |
D | Westgate |
Transport Services
First/Last Train Timing
Destination | First Train | Last Train | ||
---|---|---|---|---|
Mon − Fri | Sat | Sun & P.H. | Daily | |
File:MRTFFF.png North South Line
Template:MRTTime Template:MRTTime Template:MRTTime Template:MRTTime | ||||
File:MRTFFF.png East West Line |
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
28009 | Jurong East Temp Int |
|
28241 | Opp Jurong East Lib |
|
28249 | Jurong East Lib |
|
28201 | Opp The JTC Summit |
References
- ↑ "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority (16 May 2011).
- ↑ "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia.
- ↑ "The Jurong East Modification Project (JEMP)". Land Transport Authority.
Template:North South Line Template:East West Line
Jurong Region Line | [ V • T • E ] | |
---|---|---|
Stations | Choa Chu Kang • Choa Chu Kang West • Tengah • Hong Kah • Corporation • Jurong West • Bahar Junction • Boon Lay • Enterprise • Tukang • Jurong Hill • Jurong Pier | |
Jurong West ExtensionBahar Junction • Gek Poh • Tawas • Nanyang Gateway • Nanyang Crescent • Peng Kang Hill | ||
Jurong East ExtensionTengah • Tengah Plantation • Tengah Park • Bukit Batok West • Toh Guan • Jurong East • Jurong Town Hall • Pandan Reservoir | ||
Rolling Stock | J151 | |
Depots | Tengah | |
Others | Bridging Service |