Changi Airport station

From SgWiki
Revision as of 15:49, 3 September 2018 by Supernutorcrazy (talk | contribs) (Undo revision 423024 by Dragomir7 (talk))
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png Changi Airport Skytrain Airport
Abbreviation CGA

Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opens

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.

Station Planning

The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.

The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.

Layout

L2 Departure Hall Changi Airport Skytrain
L1 Arrival Hall
Street Level Changi Airport
B1 Link Bridge Changi Airport PTB Bus Terminal, Link bridge between Terminal 2 and 3
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Platform A East–West Line
Template:Terminus
Platform A/B
Platform B East–West Line
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2
B Handicapped/disabled access Changi Airport Terminal 3

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service |}

Notes: Last connecting train to Tuas Link will depart at 23:18.

Bus

Changi Airport station/Alternate Bus Service

References


Template:East West Line