Changi Airport station

From SgWiki
Revision as of 23:04, 10 March 2022 by Supernutorcrazy (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

CG2
Changi Airport
樟宜机场
சாங்கி விமானநிலையம்
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Structure Underground
Connections Bus Taxi Changi Airport Skytrain Airport
Abbreviation CGA

Changi Airport (CG2) is a Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opened
7 July 2017 Station involved in Exercise Northstar 10 (Counter terrorism)[1]

Station Planning

The earlier plans had long been made for a new line branching off from the existing East–West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island.[2] However, the route alignment showed a deviation from previous plans. The final plan involved building only the first two stations, namely the Expo and Changi Airport stations, the underground station built between Terminal 2 and Terminal 3. The alignment of the station at the airport has been switched perpendicularly such that the station leads to two of the terminals directly from either end of the station.[3]

Initial trains operation

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to ridership falling below expectations, the service was reverted into shuttle service on 22 July 2003.

2002 incident

On 24 July 2002, a glass panel of the atria wall shattered. The area was quickly closed off, but train services were not affected.[4]

2003 incident

On 24 September 2003, a man died at the station, apparently having fallen five stories from the departure hall.[5]

2020 track cracks

On 17 January 2020, SMRT had found a crack in the crossing near this station during inspection works in the morning. Trains have to be diverted to only one platform and have to travel at a slower speed as they approach the affected crossing.[6]

Layout

L3 Linkbridge to Jewel
Viewing Gallery
L2 Departure Hall Changi Airport, Changi Airport Skytrain
L1 Arrival Hall Changi Airport
M Linkbridge
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Template:Route/1
Platform A/B
Template:Route/1

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2, Changi Airport Jewel, Changi Airport Skytrain
B Handicapped/disabled access Changi Airport Terminal 3, Changi Airport Jewel, Changi Airport Skytrain

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
icon East–West Line
CGEW4Tanah Merah 05:31 05:31 05:59 00:06

Bus

More travel information: Alternative Travel Method
Bus Stop Exit Bus Service
Changi Airport Ter 2 icon95129
PTB2 Basement
A
Changi Airport Ter 3 icon95109
PTB3 Basement
B

References

Template:East West Line