Jurong East station

From SgWiki
Revision as of 22:52, 11 May 2018 by Supernutorcrazy (talk | contribs) (Supernutorcrazy moved page Jurong East Station to Jurong East station without leaving a redirect)
Jump to: navigation, search


!
TRAVEL ADVISORY
!
SMRT East West Line: Train service between Outram Park and Jurong East stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SBS Transit North East Line: Train service between Serangoon and Punggol stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
SMRT East West Line: Train service between Pasir Ris and Tanah Merah stations will end at 11pm. Shuttle bus service is available. Certain bus service will be extended to coincide with the last bus timing. Please refer here for more information.
Go-Ahead: From 18 November 2019, short trip services 68A and 68B will be introduced between Tampines Int and Tampines Avenue 11 to serve commuters better. Please refer here for more information.
SMRT Bukit Panjang LRT: From 1 December 2019, operating hours for Service A (via Senja station) will be shorten to operate only during Weekdays Peak Hours. Please refer here for more information.
NS1EW24JE5
Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North South Line
East West Line
Jurong Region Line
(Under Planning)
Connections Bus Taxi
Template:Infobox

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North South Line, the East West Line and the future Jurong Region Line, and serves as an interchange station between the two lines.

During peak periods, trains arrive directly from Ulu Pandan Depot to start service on both the North South Line and the East West Line. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.[1]

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
18 December 2009 Half-Height Platform Screen Doors operates
27 May 2011 Jurong East Modification Project opens[2][3]
30 June 2012 High Volume, Low Speed Blade fans operates

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[4]

Layout

L3 Platform A North South Line
Template:Terminus
Platform A/B
Platform B/C East West Line
Template:Terminus
Template:Terminus
Platform C/D
Platform D/E North South Line
Template:Terminus
Platform E/F
Platform F East West Line
Template:Terminus
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
(28009) Jurong East Temp Int A
41
49
51
52
66
78
79
97
97e
98
98M
105
143
143M
160
183
197
333
334
335
506
(28061) Jurong East Stn/Int A
49
98
98M
99
990
(28069) Blk 203 A
49
99
(28241) Opp Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28249) Jurong East Lib A
51
78
79
97
97e
143
143M
176
178
197
198
333
(28201) Opp The JTC Summit B
990

References

  1. "Jurong East Interchange Station in 1991". Youtube.
  2. "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority (16 May 2011).
  3. "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia.
  4. "The Jurong East Modification Project (JEMP)". Land Transport Authority.
North South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots BishanUlu Pandan
East West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link
Changi Airport Extension: Tanah MerahExpoChangi Airport
Rolling Stock C151C151AC151BC151CC651C751BCR151
Depots ChangiUlu PandanTuasEast Coast
Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West Extension: Bahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East Extension: TengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock CJ151