Ulu Pandan Depot

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service on the East–West Line between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026. LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service 298X will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

SBS Transit Go-Ahead
  • From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for residents living in the North-East Corridor. Please refer here for more information.

SMRT Buses
  • From Sunday, 12 January 2025, new bus service 967 will be introduced to enhance connectivity for residents staying along Woodlands Avenue 1, as well as some residents in Marsiling and Admiralty, to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.

Ulu Pandan Depot
乌鲁班丹车厂
உலு பாண்டான் பணிமனை
Statistics
Address 20 Toh Tuck Avenue
Singapore 597006
Line(s) North–South Line
East–West Line
Rolling Stock(s) 151
751B
151A
151B
151C
R151

Ulu Pandan Depot is the second train depot in Singapore. It maintains trains for the North–South Line and East–West Line. Since the opening of the Tuas Depot, Ulu Pandan Depot mainly maintains trains for the North–South Line.

History[edit]

Date Event
12 March 1988 Depot officially opens

Reception Tracks[edit]

On the North–South Line and East–West Line, it has 3 reception tracks, 2 that lead to Jurong East station and 1 lead to Clementi station.

References[edit]


icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah
icon North–South Line [ VTE ]
Stations Jurong EastBukit BatokBukit GombakChoa Chu KangYew TeeKranjiMarsilingWoodlandsAdmiraltySembawangCanberraYishunKhatibYio Chu KangAng Mo KioBishanBraddellToa PayohNovenaNewtonOrchardSomersetDhoby GhautCity HallRaffles PlaceMarina BayMarina South Pier
Rolling Stock 151751B151A151B151CR151

Former651

Depots BishanUlu Pandan
Others Bridging Service
icon East–West Line [ VTE ]
Stations Pasir RisTampinesSimeiTanah MerahBedokKembanganEunosPaya LebarAljuniedKallangLavenderBugisCity HallRaffles PlaceTanjong PagarOutram ParkTiong BahruRedhillQueenstownCommonwealthBuona VistaDoverClementiJurong EastChinese GardenLakesideBoon LayPioneerJoo KoonGul CircleTuas CrescentTuas West RoadTuas Link

Changi Airport ExtensionTanah MerahExpoChangi Airport

Rolling Stock 151751B151A151B151CR151

Former651

Depots ChangiUlu PandanTuasEast Coast
Others Bridging Service