Line 28: Line 28:
|width=120|30 December 2011
|width=120|30 December 2011
|width=600|Service C resumed its service after Junction 10 shopping mall was re-opened.
|width=600|Service C resumed its service after Junction 10 shopping mall was re-opened.
|-
|width=120|2018
|width=600|Service C was withdrawn due to the permanent closure of Ten Mile Junction.
|}
|}



Revision as of 03:21, 7 November 2018


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between these stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

Go-Ahead
  • From Sunday, 23 June 2024, Services
    84G
    &
    84W
    will be introduced to serve Punggol Way and New Punggol Rd in both directions. Please refer here for more information.

SBS Transit
  • From Monday, 24 June 2024, short trip services
    86A
    &
    86B
    will be introduced.
    • Short Trip
      86A
      will start from Jln Kayu (B/S 68119 (Aft Seletar Camp G)) and will terminate at Ang Mo Kio Ave 6 (B/S 55189 (Yio Chu Kang Stn)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
    • Short Trip
      86B
      will start from Ang Mo Kio Ave 6 (B/S 55181 (Opp Yio Chu Kang Stn)) and will terminate at Jln Kayu (B/S 68111 (Bef Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during evening peak hours.
  • Please refer here for more information.

Land Transport Authority SBS Transit
  • From 30 June 2024 to 21 July 2024, train services on the North East Line will start later at 8am on Sundays. This is to facilitate the integrated testing of systems for the opening of the new Punggol Coast Station. Please refer here

SBS Transit
  • From Sunday, 14 July 2024, Service
    410G
    will be amended to ply Bishan St 23, calling at new bus stop in front of Blk 228 (53439). In addition, it will also start earlier at 5:25am on weekdays and 5:40am on weekends and public holidays from the bus stop at Blk 454 Sin Ming Ave (53369). Please refer here for more information.

Bukit Panjang LRT
武吉班让轻轨
C801 112 x C801A.jpg
Statistics
Status Operational
Termini Choa Chu Kang
Ten Mile Junction
Stations 14
Services 3
Operator(s) SMRT
Rolling stock C801,C801A
Line length 7.8 km
Electrification Third rail

Bukit Panjang LRT (BPLRT) is the first Light Rail Transit (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 7.8 km long with 14 stations and it is fully automated. The project was contracted to Adtranz, Keppel Corporation and Gammon Construction.

History

Initial System
6 November 1999 Choa Chu Kang - Ten Mile Junction
10 December 2010 Service C was withdrawn due to redevelopment of Ten Mile Junction.
30 December 2011 Service C resumed its service after Junction 10 shopping mall was re-opened.
2018 Service C was withdrawn due to the permanent closure of Ten Mile Junction.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:LRTFFF.png Bukit Panjang LRT
2
Choa Chu Kang Choa Chu Kang-BPLRT.png Choa Chu Kang Terminus
Interchange with North–South Line
1
South View South View
1
Keat Hong Keat Hong
1
Teck Whye Teck Whye
1
Phoenix Phoenix
2
Bukit Panjang Bukit Panjang-BPLRT.png Bukit Panjang Interchange with Downtown Line
1
Petir Petir-BPLRT.png Petir
1
Pending Pending
1
Bangkit Bangkit
1
Fajar Fajar
1
Segar Segar
1
Jelapang Jelapang
1
Senja Senja
1
Ten Mile Junction Ten Mile Junction-BPLRT.png Ten Mile Junction Terminus

Services

Service Route Notes
A Choa Chu KangTemplate:STNPetirChoa Chu Kang
B Choa Chu KangPetirTemplate:STNChoa Chu Kang
C Ten Mile JunctionTemplate:STNPetirTen Mile Junction Operates only at selected timings.

Rolling stock

The rolling stock consists of Bombardier INNOVIA C801 and Bombardier INNOVIA C801A trains. These trains operate from Ten Mile Junction Depot near Ten Mile Junction station. The Ten Mile Junction Depot has maintenance and train overhaul facilities for trains along the Bukit Panjang LRT Line.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A810810A
Future801B810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Bukit Panjang LRT [ VTE ]
Stations Choa Chu KangSouth ViewKeat HongTeck WhyePhoenixBukit PanjangPetirPendingBangkitFajarSegarJelapangSenja
FormerTen Mile Junction
Rolling Stock 801801A801B
Depots Ten Mile Junction
Others Bukit Panjang LRT Bridging Service