Difference between revisions of "Tanah Merah station"

From SgWiki
Jump to navigation Jump to search
m
m
Line 15: Line 15:
The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. Despite having the station code of <small>{{Code/2|EW4|CG|{{CSS/EWL|nofg=|nobc=}}|{{CSS/EWL|nofg=|nobc=}}|b1=solid|h=14px|w=37px|r=8px}}</small>, the official station code for this station remains <small>{{Code/1|EW4|{{CSS/EWL|nofg=|nobc=}}|h=14px|w=37px|r=8px}}</small>.
The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. Despite having the station code of <small>{{Code/2|EW4|CG|{{CSS/EWL|nofg=|nobc=}}|{{CSS/EWL|nofg=|nobc=}}|b1=solid|h=14px|w=37px|r=8px}}</small>, the official station code for this station remains <small>{{Code/1|EW4|{{CSS/EWL|nofg=|nobc=}}|h=14px|w=37px|r=8px}}</small>.


Similar to other stations on the eastern section of the [[East West Line]], the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.
Similar to other stations on the eastern section of the {{EWL|b=}}, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.


==History==
==History==
Line 26: Line 26:
===Tanah Merah Modification Project===
===Tanah Merah Modification Project===
[[File:TMEP.png|thumb|250px|right|An artist impression of the station with the additional platform]]
[[File:TMEP.png|thumb|250px|right|An artist impression of the station with the additional platform]]
The Tanah Merah Modification Project (TMMP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airport at a shorter intervals. Construction enhancements commenced in 2016 and is expected to be completed by 2024.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=eaf97df7-016d-4a4d-9741-48310ac47112 "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport"]. Land Transport Authority. Retrieved 25 August 2014.</ref>
The Tanah Merah Modification Project (TMMP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards {{Stn|Changi Airport}} at a shorter intervals. Construction enhancements commenced in 2016 and is expected to be completed by 2024.<ref>[//www.lta.gov.sg/apps/news/page.aspx?c=2&id=eaf97df7-016d-4a4d-9741-48310ac47112 "New Platform at Tanah Merah MRT Station for Faster Travel to Expo and Changi Airport"]. Land Transport Authority. Retrieved 25 August 2014.</ref>


==Layout==
==Layout==

Revision as of 11:36, 24 July 2020

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit SMRT Trains Tower Transit Go-Ahead

SMRT Buses
  • From 22 December 2024, bus service 193 will serve an additional bus stop along Benoi Road, opposite Joo Koon Interchange. Please refer here for more information.

SBS Transit Go-Ahead
  • From Thursday, 2 January 2025, City Direct Services 675, 676, 677 & 678 will be introduced to provide a faster connection to the city for commuters along the North-East Corridor. Please refer here for more information.

SMRT Buses
  • From Sunday, 12 January 2025, bus service 967 will be introduced to enhance connectivity for commuters in Marsiling and Admiralty to nearby transport nodes and local amenities in Woodlands. Please refer here for more information.

SMRT Buses
  • From Monday, 13 January 2025, bus service 912M will be withdrawn with the introduction of new bus service 967 under the Land Transport Authority’s Bus Connectivity Enhancement Programme (BCEP). Please refer here for more information.

Template:Code/2
Tanah Merah
丹那美拉
தானா மேரா
Tanah Merah-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 920 New Upper Changi Road
Singapore 467356
Line(s) East–West Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation TNM

Tanah Merah (EW4/CG) is an elevated Mass Rapid Transit (MRT) station on the East–West Line.

The station is the only interchange station not to be part of two or more lines, due to it being an interchange between the main line and its extension. Despite having the station code of Template:Code/2, the official station code for this station remains Template:Code/1.

Similar to other stations on the eastern section of the East–West Line, the station's design consists of white-washed walls and a dome-shaped ceiling, with a glass roof running along the middle of the station.

History

Date Event
4 November 1989 Station officially opens

Tanah Merah Modification Project

An artist impression of the station with the additional platform

The Tanah Merah Modification Project (TMMP) was announced by Land Transport Authority (LTA) on 25 August 2014 which consists of an additional track and platform to allow trains arriving and departing towards Changi Airport at a shorter intervals. Construction enhancements commenced in 2016 and is expected to be completed by 2024.[1]

Layout

L2 Template:Route/1
Platform A/C
Template:Route/1
Platform B/D
Template:Route/1
L1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
Street Level
B1 Underpass

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access New Upper Changi Road, APSN Katong School, Bedok View Secondary School
B Handicapped/disabled access New Upper Changi Road

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png East West Line
EW1Pasir Ris 05:16 05:16 05:42 00:33
EW33Tuas Link 05:37 05:37 06:03 23:33
CG2Changi Airport 05:20 05:20 05:47 23:50

Bus

Bus Stop Exit Bus Service
85099 Tanah Merah Stn Exit A
2 9 12 12e 14 24 31 35 35M 38 45 47 48
85091 Tanah Merah Stn Exit B
2 9 12 12e 14 24 31 35 35M 38 45 47 48

References

Template:East West Line