Difference between revisions of "Braddell station"

From SgWiki
Jump to navigation Jump to search
m
m
Line 1: Line 1:
{{Infobox/Station
{{Infobox/Station
|TA1=RNS
|TA1=RNS
|Code={{Code/S|NS18|{{CSS/NSL|nofg=|nobc=}}}}
|Code={{Code/S|NS18|NSL}}
|Name=Braddell<br>布莱德<br>பிரேடல்
|Name=Braddell<br>布莱德<br>பிரேடல்
|Img=[[File:Braddell-NSL.png|centre|300px]]
|Img=[[File:Braddell-NSL.png|centre|300px]]
Line 66: Line 66:
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
!width=70|Mon − Fri!!width=70|Sat!!width=70|Sun & P.H.!!width=70|Daily
|-
|-
!colspan=5 style="{{CSS/NSL|nofg=|nobc=|bc=}}text-align:center;"|[[File:MRTFFF.png|20px|link=|alt=]] {{NSL|style={{CSS/NSL|nobg=|nofg=|nobc=|bc=}}}}
!colspan=5 style="{{CSS/NSL|s=|t=}}text-align:center;"|[[File:MRTFFF.png|20px|link=|alt=]] {{NSL|style={{CSS/NSL|bg=none|s=|t=}}}}
{{Timing|NS1||06:06|06:21|06:27|00:12|nv=}}
{{Timing|NS1||06:06|06:21|06:27|00:12|nv=}}
{{Timing|NS7||L=00:27|nv=}}
{{Timing|NS7||L=00:27|nv=}}

Revision as of 17:37, 26 July 2021


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

NS18
Braddell
布莱德
பிரேடல்
Braddell-NSL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 377 Lorong 1 Toa Payoh
Singapore 319756
Line(s) North–South Line
Structure Underground
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation BDL

Braddell (NS18) is a Mass Rapid Transit (MRT) station on the North–South Line.

History

Date Event
7 November 1987 Station officially opened

Construction desgin

When the MRT system was under planning in the 1980s, the Mass Rapid Transit Corporation (now splited into SMRT Corporation and Land Transport Authority) tried to design the track system and position in order to enable the station to have a common platform. However, the closely built housing blocks in the area meant that the MRT system tunnels had to be constructed directly under Lorong 2 Toa Payoh, following the bend of the road. The result made it impossible for tracks to diverge at a common platform station, as the angle southbound trains would turn when approaching and leaving the station would be too great. Additionally, it would be unfeasible to change the position of the station, because moving it south would render it too close to Toa Payoh station, while moving it north would be impossible because of surrounding housing blocks and factories. It was thus built with side platforms.

2017 tunnel flooding

On 7 October 2017, water got into a section of the tunnel between Bishan and Braddell stations during a heavy downpour in the afternoon, which disrupted train services between Ang Mo Kio and Marina South Pier for several hours. This case of water entering MRT tunnels is believed to be the first time it has affected train service. Separately, at about 5.55pm, a small fire was spotted trackside in the tunnel between the Raffles Place and Marina Bay stations, but it had died down by itself. It is not clear if it is linked to the flood, although electrical short circuits caused by water had sparked tunnel fires before.[1] Train services between Newton and Marina South Pier were restored on the day itself at about 9.20pm while full train service resumed at 1.36pm the following day after overnight efforts to clear the water in the tunnel.[2] It was revealed that the overflowing in the tunnel was caused by a malfunction in the water pumping system, which has since been repaired.[3]

Layout

L1 Street Level
B1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B2
Platform A
Template:Route/2
Template:Route/1
Platform B

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Lorong 1 Toa Payoh
B Handicapped/disabled access Lorong 1 Toa Payoh, Lorong 2 Toa Payoh
C Yellow Pages Building

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png North–South Line
NS1Jurong East 06:06 06:21 06:27 00:12
NS7Kranji 00:27
NS28Marina South Pier 05:39 05:39 06:04 23:36
NS19Toa Payoh 00:18

Bus

Bus Stop Exit Bus Service
52161 Braddell Stn/Blk 111
52171 Braddell Stn/Blk 107
52179 Braddell Stn/Blk 106

References

Template:North South Line