Difference between revisions of "Jurong East station"

From SgWiki
Jump to navigation Jump to search
m (Reverted edits by Thefoodie (talk) to last revision by Supernutorcrazy)
m
Line 1: Line 1:
{{Infobox/Station
{{Infobox/Station
|Terminus=[[File:MRT Destination 4.png|30px|center]]
|Terminus=[[File:MRT Destination 4.png|30px|center]]
|Code={{Code|2|NSL|NS1|EWL|EW24}}
|Code={{Code|3|NSL|NS1|EWL|EW24|JRL|JE5}}
|Name=Jurong East<br>裕廊东<br>ஜூரோங் கிழக்கு
|Name=Jurong East<br>裕廊东<br>ஜூரோங் கிழக்கு
|Img=[[File:Jurong East-NSL-EWL.png|centre|300px]]
|Img=[[File:Jurong East-NSL-EWL.png|centre|300px]]
|Info=
|Info=
  {{Infoline|Address|10 Jurong East Street 12<br>Singapore 609690}}
  {{Infoline|Address|10 Jurong East Street 12<br>Singapore 609690}}
  {{Infoline|Line(s)|{{NSL}}<br>{{EWL}}}}
  {{Infoline|Line(s)|{{NSL}}<br>{{EWL}}<br>{{JRL}}<br><small>''(Under Planning)}}
  {{Infoline|Connection|Bus, Taxi}}
  {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}}
  {{Infobox|Abbreviation|JUR}}
  {{Infobox|Abbreviation|JUR}}
}}
}}


'''Jurong East (NS1/EW24)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}} and the {{EWL}}, and serves as an interchange station between the two lines.
'''Jurong East (NS1/EW24/JE5)''' is an elevated [[Mass Rapid Transit]] (MRT) station on the {{NSL}}, the {{EWL}} and the future {{JRL}}, and serves as an interchange station between the two lines.


During peak periods, trains arrive directly from [[Ulu Pandan Depot]] to start service on both the [[North South Line]] and the [[East West Line]]. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.<ref>[//www.youtube.com/watch?v=a4S7wI8N0EU "Jurong East Interchange Station in 1991". Youtube.]</ref>
During peak periods, trains arrive directly from [[Ulu Pandan Depot]] to start service on both the [[North South Line]] and the [[East West Line]]. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.<ref>[//www.youtube.com/watch?v=a4S7wI8N0EU "Jurong East Interchange Station in 1991". Youtube.]</ref>
Line 35: Line 35:


==Layout==
==Layout==
{| style="border-collapse:collapse;border-top:1px solid #888;border-bottom:1px solid #888;"
{| class="layout"
|-
|-
!rowspan=7 valign=top|L3
!rowspan=7 valign=top|L3
|Platform A||{{NSL}}<br>{{Terminus|NSL|4|←}}
|Platform A||{{NSL}}<br>{{Terminus|NSL|4|←}}
|-
|-
|colspan=2 style="border:2px solid;text-align:center;"|Platform A/B
|colspan=2 class="platform"|Platform A/B
|-
|-
|Platform B/C||{{EWL}}<br>{{Terminus|EWL|1|→}}<br>{{Terminus|EWL|4|→}}
|Platform B/C||{{EWL}}<br>{{Terminus|EWL|1|→}}<br>{{Terminus|EWL|4|→}}
|-
|-
|colspan=2 style="border:2px solid;text-align:center;"|Platform C/D
|colspan=2 class="platform"|Platform C/D
|-
|-
|Platform D/E||{{NSL}}<br>{{Terminus|NSL|4|←}}
|Platform D/E||{{NSL}}<br>{{Terminus|NSL|4|←}}
|-
|-
|colspan=2 style="border:2px solid;text-align:center;"|Platform E/F
|colspan=2 class="platform"|Platform E/F
|-
|-
|Platform F||{{EWL}}<br>{{Terminus|EWL|2|←}}
|Platform F||{{EWL}}<br>{{Terminus|EWL|2|←}}
|- style="border-top:1px solid #888;" valign=top
|- valign=top
!width=25|L2
!width=25|L2
|width=125|Concourse
|width=125|Concourse
|width=500|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|width=500|Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
|- style="border-top:1px solid #888;" valign=top
|- valign=top
!L1
!L1
|Street Level
|Street Level
Line 105: Line 105:
<references/>
<references/>


{{Singapore MRT stations}}
{{North South Line}}
{{North South Line}}
{{East West Line}}
{{East West Line}}
{{Jurong Region Line}}

Revision as of 22:51, 11 May 2018


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

3

Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North–South Line
East–West Line
Jurong Region Line
(Under Planning)
Connections File:Bus Logo.png File:Taxi Logo.png
 

 

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North–South Line, the East–West Line and the future Jurong Region Line, and serves as an interchange station between the two lines.

During peak periods, trains arrive directly from Ulu Pandan Depot to start service on both the North South Line and the East West Line. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.[1]

History

Date Event
5 November 1988 Station officially opens
10 March 1990 Station interchanges with North South Line (then East West Line Branch Extension)
18 December 2009 Half-Height Platform Screen Doors operates
27 May 2011 Jurong East Modification Project opens[2][3]
30 June 2012 High Volume, Low Speed Blade fans operates

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[4]

Layout

L3 Platform A North–South Line
Template:Terminus
Platform A/B
Platform B/C East–West Line
Template:Terminus
Template:Terminus
Platform C/D
Platform D/E North–South Line
Template:Terminus
Platform E/F
Platform F East–West Line
Template:Terminus
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
L1 Street Level Jurong East Bus Interchange

Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service Template:Rail Service |}

Bus

Bus Stop Exit Bus Service
28009 Jurong East Temp Int
28061 Jurong East Stn/Int
28069 Blk 203
28241 Opp Jurong East Lib
28249 Jurong East Lib
28201 Opp The JTC Summit

References

Template:North South Line Template:East West Line

icon Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West ExtensionBahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East ExtensionTengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock J151
Depots Tengah
Others Bridging Service