Difference between revisions of "Jurong East station"
m (Supernutorcrazy moved page Jurong East Station to Jurong East station without leaving a redirect) |
m |
||
Line 8: | Line 8: | ||
{{Infoline|Line(s)|{{NSL}}<br>{{EWL}}<br>{{JRL}}<br><small>''(Under Planning)}} | {{Infoline|Line(s)|{{NSL}}<br>{{EWL}}<br>{{JRL}}<br><small>''(Under Planning)}} | ||
{{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}} | {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}} | ||
{{ | {{Infoline|Abbreviation|JUR}} | ||
}} | }} | ||
Revision as of 22:54, 11 May 2018
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
3 Jurong East 裕廊东 ஜூரோங் கிழக்கு*Graphic From SGTrains/Wikipedia/LTA | |
Statistics | |
---|---|
Address | 10 Jurong East Street 12 Singapore 609690 |
Line(s) | North–South Line East–West Line Jurong Region Line (Under Planning) |
Connections | File:Bus Logo.png File:Taxi Logo.png |
Abbreviation | JUR |
Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North–South Line, the East–West Line and the future Jurong Region Line, and serves as an interchange station between the two lines.
During peak periods, trains arrive directly from Ulu Pandan Depot to start service on both the North South Line and the East West Line. This station was also the first station to make announcements about train services when the Branch Extension opened in 1990.[1]
History
Date | Event |
---|---|
5 November 1988 | Station officially opens |
10 March 1990 | Station interchanges with North South Line (then East West Line Branch Extension) |
18 December 2009 | Half-Height Platform Screen Doors operates |
27 May 2011 | Jurong East Modification Project opens[2][3] |
30 June 2012 | High Volume, Low Speed Blade fans operates |
Jurong East Modification Project
The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North South Line to enter and depart the station at the same time. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allow for shorter train intervals, reducing waiting times and reducing the crowding in trains.[4]
Layout
L3 | Platform A | North–South Line Template:Terminus |
---|---|---|
Platform A/B | ||
Platform B/C | East–West Line Template:Terminus Template:Terminus | |
Platform C/D | ||
Platform D/E | North–South Line Template:Terminus | |
Platform E/F | ||
Platform F | East–West Line Template:Terminus | |
L2 | Concourse | Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office |
L1 | Street Level | Jurong East Bus Interchange |
Notes: Platform A and B will opens between 6am and 10am and 5pm and 8pm on Weekdays except PH.
Exits
Exit | Disabled-Access | Location/Nearby |
---|---|---|
A | Jurong East Bus Interchange, Jurong Gateway Road, Jurong East Central, JCube mall | |
B | Venture Avenue, Jurong Gateway Road | |
C | JEM, Big Box | |
D | Westgate |
Transport Services
Rail
Template:Rail Head Template:Rail Line Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Service Template:Rail Line Template:Rail Service Template:Rail Service |}
Bus
Bus Stop | Exit | Bus Service |
---|---|---|
28009 | Jurong East Temp Int |
|
28061 | Jurong East Stn/Int |
|
28069 | Blk 203 |
|
28241 | Opp Jurong East Lib |
|
28249 | Jurong East Lib |
|
28201 | Opp The JTC Summit |
References
- ↑ "Jurong East Interchange Station in 1991". Youtube.
- ↑ "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority (16 May 2011).
- ↑ "Waiting times cut with new platform at Jurong East MRT station". Channel NewsAsia.
- ↑ "The Jurong East Modification Project (JEMP)". Land Transport Authority.
Template:North South Line Template:East West Line
Jurong Region Line | [ V • T • E ] | |
---|---|---|
Stations | Choa Chu Kang • Choa Chu Kang West • Tengah • Hong Kah • Corporation • Jurong West • Bahar Junction • Boon Lay • Enterprise • Tukang • Jurong Hill • Jurong Pier | |
Jurong West ExtensionBahar Junction • Gek Poh • Tawas • Nanyang Gateway • Nanyang Crescent • Peng Kang Hill | ||
Jurong East ExtensionTengah • Tengah Plantation • Tengah Park • Bukit Batok West • Toh Guan • Jurong East • Jurong Town Hall • Pandan Reservoir | ||
Rolling Stock | J151 | |
Depots | Tengah | |
Others | Bridging Service |