Mitsubishi Heavy Industries 810A

From SgWiki
Jump to navigation Jump to search
Mitsubishi Heavy Industries C810A
center-left center-right
*Graphic From SGTrains/Wikipedia/LTA
In service 2016 – Present
Manufacturer Mitsubishi Heavy Industries
Origin Mihara, Japan
Constructed 2016
Number Built 16 cars (16 Trains)
Statistics
Body Construction Welded Aluminium alloy
Length 11.2 m
Width 2.7 m
Height 3.6 m
Doors 2 m, 4 per car
Maximum Speed Design: 80 km/h
Service: 70 km/h
Traction Control Mitsubishi IGBT-VVVF
Line Voltage 750V DC Third Rail
Track Gauge Side-mounted Guideway

Mitsubishi Heavy Industries C810A are the second generation of trains running on the Sengkang LRT and the Punggol LRT.

History

This additional batch of trains is an effort by the Land Transport Authority to increase the capacity of the Sengkang-Punggol LRT by about 40%, boosting train capacity during peak hours.

Design/Features

Initial
M
Exterior Design
Livery Navel Blue
Train Run Number N/A
Interior Design
Seating Capacity 14
Wheelchair Bay N/A
Door Closing Indicator Lights N/A
System
Safety System ATC, ATO, ATP, ATS
Signalling System Fixed Block
Traction Control IGBT-VVVF (Mitsubishi)

Fleet Numbering

The car numbers of the trains range from 42 to 57.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service
icon Punggol LRT [ VTE ]
Stations Punggol
East LoopCoveMeridianCoral EdgeRivieraKadaloorOasisDamai
West LoopSam KeeTeck LeePunggol PointSamuderaNibongSumangSoo Teck
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service