Jurong East station

From SgWiki
Revision as of 13:10, 6 December 2020 by Peace & Harmony (talk | contribs)
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Template:Code/3
Jurong East
裕廊东
ஜூரோங் கிழக்கு
Jurong East-NSL-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 10 Jurong East Street 12
Singapore 609690
Line(s) North–South Line
East–West Line
Jurong Region Line (Future)
Structure Elevated
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation JUR

Jurong East (NS1/EW24/JE5) is an elevated Mass Rapid Transit (MRT) station on the North–South Line, the East–West Line and the future Jurong Region Line[1].

History

Date Event
5 November 1988 Station officially opened
10 March 1990 Station interchanged with North–South Line (former East–West Line Branch Extension)
4 September 2010 - 5 September 2010 Station (East–West Line towards Pasir Ris) closed due to the construction of Jurong East Modification Project (JEMP)[2]
18 September 2010 - 19 September 2010 Station (North–South Line) closed due to the construction of Jurong East Modification Project (JEMP)[3]
27 May 2011 Jurong East Modification Project officially opened[4]
10 December 2017 Station closed due to the upgrading of signaling system on the East–West Line[5]
17 December 2017

Jurong East Modification Project

The Jurong East Modification Project (JEMP) was a key infrastructural upgrading project involving the construction of two new platforms and a new track at Jurong East, allowing two trains along the North–South Line to enter and depart the station concurrently. Previously, trains had to take turns to arrive and depart from the station using a shared middle track. The new platforms and track allowed for shorter train intervals, reducing waiting times and reducing the crowding in trains.[6]

2005 bomb hoax

On 4 February 2005, Mak Hoy Meng, 29, went up to an SMRT employee at this station and gave him two handwritten notes that declared there was a bomb at one of the stations.[7] The restaurant supervisor told Yeow Meng Chai that he saw a man drop the notes and even described the fellow in detail, down to the brand of the bag he was carrying. But under questioning by the police, he admitted he had written them himself and there were no bombs. His story came apart when his description differed in later versions. By then, police officers had searched extensively for the man. However, trains were not stopped.

2011 murder

A 62 year old woman was found injured at the station at about 2.35pm on 24 November 2011. The woman was taken to the National University Hospital where she subsequently died from her injuries. Police subsequently arrested a 55 year old man for the alleged murder the following day.[8]

Layout

L3 Template:Route/2
Platform A/B
Template:Route/3
Platform C/D
Template:Route/2
Platform E/F
Template:Route/1
L2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Linkbridge to Jurong East Bus Interchange
L1 Street Level

Notes: Platform A and B will open between 6am and 10am and 5pm and 8pm on Weekdays except PH, and during North–South Line train withdrawal.

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Jurong Gateway Road, Jurong East Central, JCube mall
B Handicapped/disabled access Jurong East Bus Interchange, Venture Avenue, Jurong Gateway Road
C Handicapped/disabled access JEM, Big Box
D Handicapped/disabled access Westgate

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png North–South Line
NS28Marina South Pier 05:16 05:16 05:35 22:46
NS19Toa Payoh 23:28
NS16Ang Mo Kio 00:17
File:MRTFFF.png East–West Line
EW1Pasir Ris 05:42 05:42 06:12 23:42
EW33Tuas Link 05:14 05:14 05:44 00:25

Bus

Bus Stop Exit Bus Service
28009 Jurong East Int
28241 Opp Jurong East Lib
28249 Jurong East Lib
28201 Opp The JTC Summit

References

  1. "Jurong Region Line". Land Transport Authority.
  2. "Temporary MRT service disruption". Land Transport Authority. Archived on 10 August 2017.
  3. "LTA and SMRT gear up for disruption over the weekend". Land Transport Authority. Archived on 10 August 2017.
  4. "New Platform at Jurong East Station To Open on 27 May". Land Transport Authority. Archived on 7 August 2011.
  5. "2 full-day shutdowns, shorter operating hours for 19 NSEWL MRT stations in December: LTA, SMRT". Channel NewsAsia (21 November 2017).
  6. "The Jurong East Modification Project (JEMP)". Land Transport Authority. Archived on 27 May 2011.
  7. "Man Jailed For Bomb Hoax". Straits Times (11 March 2005).
  8. "Murder at Jurong East MRT station". AsiaOne (24 November 2011). Archived on 4 October 2013.

Template:North South Line Template:East West Line

icon Jurong Region Line [ VTE ]
Stations Choa Chu KangChoa Chu Kang WestTengahHong KahCorporationJurong WestBahar JunctionBoon LayEnterpriseTukangJurong HillJurong Pier
Jurong West ExtensionBahar JunctionGek PohTawasNanyang GatewayNanyang CrescentPeng Kang Hill
Jurong East ExtensionTengahTengah PlantationTengah ParkBukit Batok WestToh GuanJurong EastJurong Town HallPandan Reservoir
Rolling Stock J151
Depots Tengah
Others Bridging Service