Difference between revisions of "Johor Bahru–Singapore Rapid Transit System"

From SgWiki
Jump to navigation Jump to search
(Created page with "{{Infobox/Line |TA=RRTS |Line=RTS |Name=Johor Bahru–Singapore Rapid Transit System |Img= |Info= {{Infoline|Status|Operational}} {{Infoline|Stations|2}} {{Infoline|Service...")
 
 
(13 intermediate revisions by the same user not shown)
Line 5: Line 5:
|Img=
|Img=
|Info=
|Info=
  {{Infoline|Status|Operational}}
  {{Infoline|Status|Under Construction}}
  {{Infoline|Stations|2}}
  {{Infoline|Stations|2}}
  {{Infoline|Services|1}}
  {{Infoline|Services|1}}
Line 12: Line 12:
}}
}}


'''Johor Bahru–Singapore Rapid Transit System (RTS)''' will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.<ref>[//www.channelnewsasia.com/news/singapore/malaysia-johor-bahru-singapore-rts-signing-july-30-12934908 "JB-Singapore RTS Link project signing ceremony to be held on Jul 30, says Malaysian transport minister"]. Channel NewsAsia (21 July 2020)</ref>
'''Johor Bahru–Singapore Rapid Transit System (RTS)''' will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.<ref>[//www.channelnewsasia.com/news/singapore/malaysia-johor-bahru-singapore-rts-signing-july-30-12934908 "JB-Singapore RTS Link project signing ceremony to be held on Jul 30, says Malaysian transport minister"]. Channel NewsAsia (21 July 2020)</ref> It will be the first line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.


==Stations==
==Stations==
{| class="wikitable"
{| class="wikitable"
|-
|-
!class="LTA"|Alpha-Numeric<br>Code!!class="LTA"|Station Name!!class="LTA"|Image!!class="LTA"|Working names!!class="LTA"|Notes
!style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Working names!!style="{{CSS/LTA|s=|t=}}"|Notes
|-
|-
!colspan=5 class="RTS"|Johor Bahru–Singapore Rapid Transit System
!colspan=5 style="{{CSS/RTS|s=|t=}}"|{{RTS|b=}}
{{Stnline|{{Code|1|RTS|RTS|S1=future}}|Bukit Chagar|RTS|Note=Terminus|Img=}}
{{Stnline|{{Code/F|RTS|RTS}}|Bukit Chagar|RTS|Note=Terminus|Img=}}
{{Stnline|{{Code|2|RTS|RTS|TEL|TE1|S1=future}}|Woodlands North|RTS|Note=Terminus<br>Connected to {{TEL}}|Img=}}
{{Stnline|{{Code/F|RTS|RTS}}{{Code/J|RTS|TEL|f=}}{{Code/S|TE1|TEL}}|Woodlands North|RTS|Note=Terminus<br>Connected to {{TEL}}|Img=}}
|}
|}


==Rolling stock==
==Rolling stock==
The rolling stock will be similar to the system used in Ampang LRT line, Malaysia. These trains operate from Bukit Chagar Depot near Bukit Chagar station.
The rolling stock will be similar to the system used in Ampang LRT Line, Malaysia and {{JRL|b=}}, Singapore. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.


==References==
==References==
Line 31: Line 31:


{{Railway Lines}}
{{Railway Lines}}
{{Johor Bahru–Singapore Rapid Transit System}}

Latest revision as of 17:43, 27 July 2021


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Monday, 13 May 2024, short-trip service
    168A
    will be introduced, plying from Woodlands Int to Tampines Ave 4 (Opp Tampines Stn/Int). It will operate during the morning and evening peak period on Weekdays and Saturdays. Please refer here for more information.

Johor Bahru–Singapore Rapid Transit System
Statistics
Status Under Construction
Stations 2
Services 1
Operator(s) Prasarana
SMRT
Line length 4 km

Johor Bahru–Singapore Rapid Transit System (RTS) will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.[1] It will be the first line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.

Stations[edit]

Alpha-Numeric
Code
Station Name Image Working names Notes
Johor Bahru–Singapore Rapid Transit System
RTS Bukit Chagar Bukit Chagar Terminus
RTSTE1 Woodlands North Woodlands North Terminus
Connected to Thomson–East Coast Line

Rolling stock[edit]

The rolling stock will be similar to the system used in Ampang LRT Line, Malaysia and Jurong Region Line, Singapore. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.

References[edit]

Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Johor Bahru–Singapore Rapid Transit System [ VTE ]
Stations Bukit ChagarWoodlands North
Depots Bukit Chagar