Difference between revisions of "Johor Bahru–Singapore Rapid Transit System"

From SgWiki
Jump to navigation Jump to search
m
m
Line 5: Line 5:
|Img=
|Img=
|Info=
|Info=
  {{Infoline|Status|Under Negotiation}}
  {{Infoline|Status|Under Construction}}
  {{Infoline|Stations|2}}
  {{Infoline|Stations|2}}
  {{Infoline|Services|1}}
  {{Infoline|Services|1}}

Revision as of 16:44, 30 July 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Monday, 13 May 2024, short-trip service
    168A
    will be introduced, plying from Woodlands Int to Tampines Ave 4 (Opp Tampines Stn/Int). It will operate during the morning and evening peak period on Weekdays and Saturdays. Please refer here for more information.

SBS Transit
  • From Sunday, 19 May 2024, The first bus timing for service
    168
    from Woodlands Interchange will be brought forward on Sundays & Public Holidays to 0545hrs. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

Johor Bahru–Singapore Rapid Transit System
Statistics
Status Under Construction
Stations 2
Services 1
Operator(s) Prasarana
SMRT
Line length 4 km

Johor Bahru–Singapore Rapid Transit System (RTS) will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.[1]

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
Johor Bahru–Singapore Rapid Transit System
Template:Code/1 Bukit Chagar Bukit Chagar Terminus
Template:Code/2 Woodlands North Woodlands North Terminus
Connected to Thomson–East Coast Line

Rolling stock

The rolling stock will be similar to the system used in Ampang LRT line, Malaysia. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.

References

Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Johor Bahru–Singapore Rapid Transit System [ VTE ]
Stations Bukit ChagarWoodlands North
Depots Bukit Chagar