Difference between revisions of "Template:Mass Rapid Transit"
Jump to navigation
Jump to search
m |
m |
||
Line 30: | Line 30: | ||
|colspan="2"| [[Mandai Depot|Mandai]] • [[East Coast Integrated Depot|East Coast]] | |colspan="2"| [[Mandai Depot|Mandai]] • [[East Coast Integrated Depot|East Coast]] | ||
|} | |} | ||
[[Category:Mass Rapid Transit]] |
Revision as of 08:00, 15 October 2017
Mass Rapid Transit | [ V • T • E ] | ||
---|---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | ||
Lines | Current | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line | |
Under Construction | Thomson–East Coast Line | ||
Future | Jurong Region Line • Cross Island Line | ||
Rolling Stocks | Current | Kawasaki Heavy Industries C151 • Kawasaki Heavy Industries & CSR Qingdao Sifang C151A • Kawasaki Heavy Industries & CSR Qingdao Sifang C151B • Siemens C651 • Alstom Metropolis C751A • Kawasaki Heavy Industries & Nippon Sharyo C751B • Alstom Metropolis C751C • Alstom Metropolis C830 • Alstom Metropolis C830C • Bombardier MOVIA C951 | |
Future | Kawasaki Heavy Industries & CSR Qingdao Sifang C151C • Kawasaki Heavy Industries & CSR Qingdao Sifang CT251 | ||
Depots | Current | Bishan • Changi • Gali Batu • Kim Chuan • Sengkang • Ulu Pandan • Tuas | |
Under Construction | Mandai • East Coast |