Difference between revisions of "Bombardier Movia 951"
(Link change.) |
|||
Line 26: | Line 26: | ||
|- | |- | ||
! Operator | ! Operator | ||
| | | {{SBST}} | ||
|- | |- | ||
! Depot(s) | ! Depot(s) | ||
Line 32: | Line 32: | ||
|- | |- | ||
! Line(s) served | ! Line(s) served | ||
| | | {{DTL}} | ||
|- | |- | ||
| style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> | | style="background:#efefef;" align="center" colspan="2"| <strong>Specifications</strong> |
Revision as of 16:49, 21 October 2017
Bombardier MOVIA C951 | |
A C951 train in Kim Chuan Depot. | |
In service | 22 December 2013 - Current |
---|---|
Manufacturer | Bombardier Transportation |
Built at | Changchun, China |
Family name | Movia |
Constructed | 2012 - 2016 |
Number built | 276 carriages (92 trains) |
Formation | 3 per trainset |
Operator | |
Depot(s) | Gali Batu, Kim Chuan |
Line(s) served | Downtown Line |
Specifications | |
Car body construction |
High capacity aluminium |
Car length | 23.37 m |
Width | 3.2 m |
Height | 3.68 m |
Weight | 38300 kg |
Acceleration | 1.1 m/s2 |
Deceleration | 1.1 m/s2 (Normal) 1.4 m/s2 (Emergency) |
Maximum speed | 90 km/h (Design) 80 km/h (Service) |
Electric system(s) | 750 V DC 3rd rail |
Gauge | 1,435 mm Standard gauge |
Bombardier MOVIA C951 is a type of train built by Bombardier Transportation for use on the Downtown Line of the Mass Rapid Transit system in Singapore.
History
In the turnkey contract C951, 4 tenderers were shortlisted - Bombardier, Alstom, Kawasaki Heavy Industries and Hyundai Rotem.
On 8 November 2008, the Land Transport Authority (LTA) awarded the contract for the supply of Downtown Line trains to Bombardier at a value of S$689.7 million.
Fleet
Operation
The C951 trains run on an automated system (without attendant), relying on "continuous two-way digital communication" between each controlled train and the control centre that controls the entire line.
Features
Design
The C951 trains may include several features that are seen in the C830C trains.[1]
New features include:
- an ergonomic seat profile;
- red reserved seats, which allows for clearer separation between normal and reserved seats;
- perch seats, replacing the two-seaters at the ends of the car;
- hand grips utilising joints instead of straps, providing commuters a steadier grip;
Dynamic Route Map Display (DRMD)
These dynamic route map display panels will provide commuters for their journey status, route information, as well as which side the train doors will open on.
Platform Gap Width Reduction (PGWR)
The train doors have a frangible gap made of rubber that protrudes out. The platform-train gap will then be reduced, preventing passenger accidents due to the platform gap.
Others
The train will have regenerative braking which is usable over a larger range of speeds. This will generate electricity when the train slows, feeding it back to the rail network.
Trainset numbers
Individual cars are given a five-digit serial number by the rail operator, SBS Transit, numbers ranging from 9001x to 9092x, whereby "x" depends on the carriage type.
- The first digit is always a 9.
- The next three digits is the train identification number. A full length train of 3 cars will have the same identification number.
- The last digit denotes the carriage of the train, ending with 1, 2 and 3 in a full length train.
References
Related Links
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751B • 751C • 830 • 830C • 851E • 951
Former651 Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |