Difference between revisions of "Sengkang LRT"

From SgWiki
Jump to navigation Jump to search
m
m
Line 1: Line 1:
{{Infobox/Line
{{Infobox/Line
|Line=SKLRT
|Line=SKLRT
|Code={{Code|1|SKLRT|SK}}<br>
|Name=Sengkang LRT<br>盛港轻轨<br>செங்காங் லைட் ரெயில்
|Name=Sengkang LRT<br>盛港轻轨<br>செங்காங் லைட் ரெயில்
|Info=
|Info=

Revision as of 10:05, 13 November 2019


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

1

Sengkang LRT
盛港轻轨
செங்காங் லைட் ரெயில்
Statistics
Status Operational
Termini Sengkang
Stations 14
Services 4
Operator(s) SBS Transit
Rolling stock C810, C810A
Line length 10.7 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Sengkang LRT (SKLRT) is the second Light Rail Transit (LRT) line. The line is currently 10.7 km long with 14 stations and it is fully automated.

History

Date Event
18 January 2003 Sengkang, Compassvale - Ranggung
29 January 2005 Thanggam - Renjong (West Loop operated in Uni-Direction)
15 November 2007 Farmway
4 January 2010 West Loop operated in both direction during Weekdays Peak Hour.
1 January 2013 Cheng Lim
West Loop operated in both direction throughout the day.
27 June 2015 Kupang
22 December 2015 Two-car trains started operation.

Stations

Alpha-Numeric
Code
Station Name Image Working names Notes
File:LRTFFF.png Sengkang LRT
2
Sengkang Sengkang-SKLRT.png Sengkang Terminus
Interchange with North East Line
File:LRTFFF.png Sengkang LRT (East Loop)
1
Compassvale Compassvale-SKLRT.png Compassvale
1
Rumbia Rumbia-SKLRT.png Rumbia
1
Bakau Bakau-SKLRT.png Bakau
1
Kangkar Kangkar-SKLRT.png Kangkar
1
Ranggung Ranggung-SKLRT.png Ranggung
File:LRTFFF.png Sengkang LRT (West Loop)
1
Cheng Lim Cheng Lim-SKLRT.png Cheng Lim
1
Farmway Farmway-SKLRT.png Farmway
1
Kupang Kupang-SKLRT.png Kupang
1
Thanggam Thanggam-SKLRT.png Thanggam
1
Fernvale Fernvale-SKLRT.png Fernvale
1
Layar Layar-SKLRT.png Layar
1
Tongkang Tongkang-SKLRT.png Tongkang
1
Renjong Renjong-SKLRT.png Renjong

Services

Service Route Notes
A SengkangCompassvaleRanggungSengkang
B SengkangRanggungCompassvaleSengkang
C SengkangCheng LimRenjongSengkang
D SengkangRenjongCheng LimSengkang

Rolling stock

The rolling stock consists of Mitsubishi Heavy Industries C810 and Mitsubishi Heavy Industries C810A trains. These trains operate from Sengkang Depot near Tongkang Station.

References


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service