Difference between revisions of "Johor Bahru–Singapore Rapid Transit System"

From SgWiki
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 12: Line 12:
}}
}}


'''Johor Bahru–Singapore Rapid Transit System (RTS)''' will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.<ref>[//www.channelnewsasia.com/news/singapore/malaysia-johor-bahru-singapore-rts-signing-july-30-12934908 "JB-Singapore RTS Link project signing ceremony to be held on Jul 30, says Malaysian transport minister"]. Channel NewsAsia (21 July 2020)</ref>
'''Johor Bahru–Singapore Rapid Transit System (RTS)''' will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.<ref>[//www.channelnewsasia.com/news/singapore/malaysia-johor-bahru-singapore-rts-signing-july-30-12934908 "JB-Singapore RTS Link project signing ceremony to be held on Jul 30, says Malaysian transport minister"]. Channel NewsAsia (21 July 2020)</ref> It will be the first line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.


==Stations==
==Stations==
{| class="wikitable"
{| class="wikitable"
|-
|-
!style="{{CSS/LTA}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA}}"|Station Name!!style="{{CSS/LTA}}"|Image!!style="{{CSS/LTA}}"|Working names!!style="{{CSS/LTA}}"|Notes
!style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Working names!!style="{{CSS/LTA|s=|t=}}"|Notes
|-
|-
!colspan=5 style="{{CSS/RTS|nofg=|nobc=|bc=}}"|Johor Bahru–Singapore Rapid Transit System
!colspan=5 style="{{CSS/RTS|s=|t=}}"|{{RTS|b=}}
{{Stnline|{{Code/1|RTS|{{CSS/RTS|nobg=|fg=|bc=}}|dashed}}|Bukit Chagar|RTS|Note=Terminus|Img=}}
{{Stnline|{{Code/F|RTS|RTS}}|Bukit Chagar|RTS|Note=Terminus|Img=}}
{{Stnline|{{Code/2|RTS|TE1|{{CSS/RTS|nobg=|fg=|bc=}}|{{CSS/TEL|nofg=|nobc=}}|dashed}}|Woodlands North|RTS|Note=Terminus<br>Connected to {{TEL}}|Img=}}
{{Stnline|{{Code/F|RTS|RTS}}{{Code/J|RTS|TEL|f=}}{{Code/S|TE1|TEL}}|Woodlands North|RTS|Note=Terminus<br>Connected to {{TEL}}|Img=}}
|}
|}



Latest revision as of 17:43, 27 July 2021


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between these stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

Go-Ahead
  • From Sunday, 23 June 2024, Services
    84G
    &
    84W
    will be introduced to serve Punggol Way and New Punggol Rd in both directions. Please refer here for more information.

SBS Transit
  • From Monday, 24 June 2024, short trip services
    86A
    &
    86B
    will be introduced.
    • Short Trip
      86A
      will start from Jln Kayu (B/S 68119 (Aft Seletar Camp G)) and will terminate at Ang Mo Kio Ave 6 (B/S 55189 (Yio Chu Kang Stn)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
    • Short Trip
      86B
      will start from Ang Mo Kio Ave 6 (B/S 55181 (Opp Yio Chu Kang Stn)) and will terminate at Jln Kayu (B/S 68111 (Bef Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during evening peak hours.
  • Please refer here for more information.

Land Transport Authority SBS Transit
  • From 30 June 2024 to 21 July 2024, train services on the North East Line will start later at 8am on Sundays. This is to facilitate the integrated testing of systems for the opening of the new Punggol Coast Station. Please refer here

SBS Transit
  • From Sunday, 14 July 2024, Service
    410G
    will be amended to ply Bishan St 23, calling at new bus stop in front of Blk 228 (53439). In addition, it will also start earlier at 5:25am on weekdays and 5:40am on weekends and public holidays from the bus stop at Blk 454 Sin Ming Ave (53369). Please refer here for more information.

Johor Bahru–Singapore Rapid Transit System
Statistics
Status Under Construction
Stations 2
Services 1
Operator(s) Prasarana
SMRT
Line length 4 km

Johor Bahru–Singapore Rapid Transit System (RTS) will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.[1] It will be the first line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.

Stations[edit]

Alpha-Numeric
Code
Station Name Image Working names Notes
Johor Bahru–Singapore Rapid Transit System
RTS Bukit Chagar Bukit Chagar Terminus
RTSTE1 Woodlands North Woodlands North Terminus
Connected to Thomson–East Coast Line

Rolling stock[edit]

The rolling stock will be similar to the system used in Ampang LRT Line, Malaysia and Jurong Region Line, Singapore. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.

References[edit]

Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Johor Bahru–Singapore Rapid Transit System [ VTE ]
Stations Bukit ChagarWoodlands North
Depots Bukit Chagar