|
|
(One intermediate revision by the same user not shown) |
(No difference)
|
Latest revision as of 17:43, 27 July 2021
!
|
TRAVEL ADVISORY
|
!
|
- Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between these stations on Friday, 21 June 2024. Please refer here for more information.
- To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.
- From Sunday, 23 June 2024, Services
84G & 84W will be introduced to serve Punggol Way and New Punggol Rd in both directions. Please refer here for more information.
- From Monday, 24 June 2024, short trip services
86A & 86B will be introduced.
- Short Trip
86A will start from Jln Kayu (B/S 68119 (Aft Seletar Camp G)) and will terminate at Ang Mo Kio Ave 6 (B/S 55189 (Yio Chu Kang Stn)). It only operates on Weekdays (except Public Holidays) during morning peak hours.
- Short Trip
86B will start from Ang Mo Kio Ave 6 (B/S 55181 (Opp Yio Chu Kang Stn)) and will terminate at Jln Kayu (B/S 68111 (Bef Seletar Camp G)). It only operates on Weekdays (except Public Holidays) during evening peak hours.
- Please refer here for more information.
- From 30 June 2024 to 21 July 2024, train services on the North East Line will start later at 8am on Sundays. This is to facilitate the integrated testing of systems for the opening of the new Punggol Coast Station. Please refer here
- From Sunday, 14 July 2024, Service
410G will be amended to ply Bishan St 23, calling at new bus stop in front of Blk 228 (53439). In addition, it will also start earlier at 5:25am on weekdays and 5:40am on weekends and public holidays from the bus stop at Blk 454 Sin Ming Ave (53369). Please refer here for more information.
|
|
Johor Bahru–Singapore Rapid Transit System
|
|
|
Statistics
|
Status
|
Under Construction
|
Stations
|
2
|
Services
|
1
|
Operator(s)
|
|
Line length
|
4 km
|
Johor Bahru–Singapore Rapid Transit System (RTS) will be a cross-border rapid transit system that would connect Woodlands, Singapore and Johor Bahru, Malaysia and is expected to begin service in 2026.[1] It will be the first line in Singapore to use both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT) denotation, with the MRT for Singapore and the LRT for Malaysia.
Stations[edit]
Rolling stock[edit]
The rolling stock will be similar to the system used in Ampang LRT Line, Malaysia and Jurong Region Line, Singapore. These trains will operate from Bukit Chagar Depot near Bukit Chagar station.
References[edit]