Difference between revisions of "Sengkang LRT"

From SgWiki
Jump to navigation Jump to search
m (Protected "Sengkang LRT" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
m
 
(20 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{Line Infobox
{{Infobox/Line
|TA=RSK
|Line=SKLRT
|Line=SKLRT
|Code={{Code/S|SK|style={{CSS/SKLRT|s=}};font-size:18px;|h=27px|r=18px 27px}}<br>
|Name=Sengkang LRT<br>盛港轻轨<br>செங்காங் லைட் ரெயில்
|Name=Sengkang LRT<br>盛港轻轨<br>செங்காங் லைட் ரெயில்
|Info 1=
|Info=
  {{Infobox|Type|Light rail}}
  {{Infoline|Status|Operational}}
{{Infobox|System|[[Light Rail Transit]]}}
  {{Infoline|Termini|{{Stn|Sengkang}}}}
{{Infobox|Status|Operational}}
  {{Infoline|Stations|14}}
  {{Infobox|Termini|{{STN|L|Sengkang}}}}
  {{Infoline|Services|4}}
  {{Infobox|Stations|14}}
  {{Infoline|Operator(s)|{{SBST}}}}
  {{Infobox|Services|4}}
  {{Infoline|Rolling stock|[[Mitsubishi Heavy Industries 810|810]], [[Mitsubishi Heavy Industries 810A|810A]]}}
|Info 2=
  {{Infoline|Line length|10.6 km}}
{{Infobox|Opened|6 November 1999}}
  {{Infoline|Track gauge|1,850 mm broad gauge}}
{{Infobox|Owner|Land Transport Authority}}
  {{Infoline|Electrification|750V DC Third rail}}
  {{Infobox|Operator(s)|{{SBST}}}}
  {{Infobox|Rolling stock|[[Mitsubishi Heavy Industries C810|C810]]<br>[[Mitsubishi Heavy Industries C810A|C810A]]}}
|Info 3=
  {{Infobox|Line length|10.7 km}}
  {{Infobox|Track gauge|1850 mm Broad Gauge}}
  {{Infobox|Electrification|Third rail}}
}}
}}


'''Sengkang LRT (SKLRT)''' is the second [[Light Rail Transit]] (LRT) line. Traveling one loop takes about 30 minutes. The line is currently 10.7 km long with 14 stations and it is fully automated.
'''Sengkang LRT (SKLRT)''' is the second [[Light Rail Transit]] (LRT) line. The line is currently 10.6 km long with 14 stations and it is fully automated.


==History==
==History==
{|class="wikitable mw-collapsible" style="border-collapse:collapsed;width:50%"
{|class="wikitable mw-collapsible" style="width:50%"
|-
|-
!width=150|Date!!Event
!width=150|Date!!Event
|-
|-
|18 January 2003||{{STN|L|Sengkang}}, {{STN|L|Compassvale}} - {{STN|L|Ranggung}}
|18 January 2003||{{Stn|Sengkang}}, {{Stn|Compassvale}} - {{Stn|Ranggung}}
|-
|-
|29 January 2005||{{STN|L|Thanggam}} - {{STN|L|Renjong}} (West Loop operated in Uni-Direction)
|29 January 2005||{{Stn|Thanggam}} - {{Stn|Renjong}}
|-
|-
|15 November 2007||{{STN|L|Farmway}}
|15 November 2007||{{Stn|Farmway}}
|-
|-
|4 January 2010||West Loop operated in both direction during Weekdays Peak Hour.
|4 January 2010||West Loop operated in both direction during weekdays peak hours
|-
|-
|rowspan=2|1 January 2013||{{STN|L|Cheng Lim}}
|rowspan=2|1 January 2013||{{Stn|Cheng Lim}}
|-
|-
|West Loop operated in both direction throughout the day.
|West Loop operated in both direction throughout the day
|-
|-
|27 June 2015||{{STN|L|Kupang}}
|27 June 2015||{{Stn|Kupang}}
|-
|-
|22 December 2015||Two-car trains started operation.
|22 December 2015||Two-car trains started operation
|}
|}


==Stations==
==Stations==
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;font-size:95%"
<div style="overflow-y:auto;width=100%">
|-style="background-color:{{Colour/BPLRT}};color:#FFF;text-align:center;"
{| class="wikitable" style='white-space:nowrap;"
!Alpha-Numeric<br>Code!!Station Name!!Notes
!style="{{CSS/LTA|s=|t=}}"|Alpha-Numeric<br>Code!!style="{{CSS/LTA|s=|t=}}"|Station Name!!style="{{CSS/LTA|s=|t=}}"|Image!!style="{{CSS/LTA|s=|t=}}"|Working names!!style="{{CSS/LTA|s=|t=}}"|Notes
|- style="text-align:center;"
!colspan=4 style="background-color:#EEE;height:25px"|Sengkang LRT
|-
|-
!{{Code|2|SKLRT|STC|NEL|NE16}}
!colspan=5 style="{{CSS/SKLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{SKLRT|b=}}
|{{STN|L|Sengkang}}
{{Stnline|{{Code/S|STC|SKLRT|rr=0|br=none}}{{Code/S|NE16|NEL|rl=0|bl=none}}|Sengkang|SKLRT|Sengkang|Terminus<br>Interchange with {{NEL}}}}
|Terminus<br>Interchange with {{NEL}}
|- style="text-align:center;"
!colspan=4 style="background-color:#EEE;height:25px"|East Loop
|-
|-
!{{Code|1|SKLRT|SE1}}
!colspan=5 style="{{CSS/SKLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{SKLRT|b=}} (East Loop)
|{{STN|L|Compassvale}}
{{Stnline|{{Code/S|SE1|SKLRT}}|Compassvale|SKLRT}}
|
{{Stnline|{{Code/S|SE2|SKLRT}}|Rumbia|SKLRT}}
{{Stnline|{{Code/S|SE3|SKLRT}}|Bakau|SKLRT}}
{{Stnline|{{Code/S|SE4|SKLRT}}|Kangkar|SKLRT}}
{{Stnline|{{Code/S|SE5|SKLRT}}|Ranggung|SKLRT}}
|-
|-
!{{Code|1|SKLRT|SE2}}
!colspan=5 style="{{CSS/SKLRT|s=|t=}}"|{{Icon|LRT|W|18px|d=inline}} {{SKLRT|b=}} (West Loop)
|{{STN|L|Rumbia}}
{{Stnline|{{Code/S|SW1|SKLRT}}|Cheng Lim|SKLRT}}
|
{{Stnline|{{Code/S|SW2|SKLRT}}|Farmway|SKLRT}}
|-
{{Stnline|{{Code/S|SW3|SKLRT}}|Kupang|SKLRT}}
!{{Code|1|SKLRT|SE3}}
{{Stnline|{{Code/S|SW4|SKLRT}}|Thanggam|SKLRT}}
|{{STN|L|Bakau}}
{{Stnline|{{Code/S|SW5|SKLRT}}|Fernvale|SKLRT}}
|
{{Stnline|{{Code/S|SW6|SKLRT}}|Layar|SKLRT}}
|-
{{Stnline|{{Code/S|SW7|SKLRT}}|Tongkang|SKLRT}}
!{{Code|1|SKLRT|SE4}}
{{Stnline|{{Code/S|SW8|SKLRT}}|Renjong|SKLRT}}
|{{STN|L|Kangkar}}
|
|-
!{{Code|1|SKLRT|SE5}}
|{{STN|L|Ranggung}}
|
|- style="text-align:center;"
!colspan=4 style="background-color:#EEE;height:25px"|West Loop
|-
!{{Code|1|SKLRT|SW1}}
|{{STN|L|Cheng Lim}}
|
|-
!{{Code|1|SKLRT|SW2}}
|{{STN|L|Farmway}}
|
|-
!{{Code|1|SKLRT|SW3}}
|{{STN|L|Kupang}}
|
|-
!{{Code|1|SKLRT|SW4}}
|{{STN|L|Thanggam}}
|
|-
!{{Code|1|SKLRT|SW5}}
|{{STN|L|Fernvale}}
|
|-
!{{Code|1|SKLRT|SW6}}
|{{STN|L|Layar}}
|
|-
!{{Code|1|SKLRT|SW7}}
|{{STN|L|Tongkang}}
|
|-
!{{Code|1|SKLRT|SW8}}
|{{STN|L|Renjong}}
|
|}
|}
</div>


==Services==
==Services==
{| class="toccolours" border=1 style="border-collapse:collapse;text-align:left;font-size:95%"
{| class="toccolours" border=1
|-style="background-color:{{Colour/SKLRT}};color:#FFF;text-align:center;"
|-style="{{CSS/SKLRT|s=|t=}}text-align:center;"
!Service!!Route!!Notes
!Service!!Route!!Notes
|-
|-
|A||{{STN|L|Sengkang}} ► {{STN|L|Compassvale}} ► {{STN|L|Ranggung}} ► {{STN|L|Sengkang}}||
|A||{{Stn|Sengkang}} ► {{Stn|Renjong}} ► {{Stn|Cheng Lim}} ► {{Stn|Sengkang}}||
|-
|-
|B||{{STN|L|Sengkang}} ► {{STN|L|Ranggung}} ► {{STN|L|Compassvale}} ► {{STN|L|Sengkang}}||
|B||{{Stn|Sengkang}} ► {{Stn|Cheng Lim}} ► {{Stn|Renjong}} ► {{Stn|Sengkang}}||
|-
|-
|C||{{STN|L|Sengkang}} ► {{STN|L|Cheng Lim}} ► {{STN|L|Renjong}} ► {{STN|L|Sengkang}}||
|C||{{Stn|Sengkang}} ► {{Stn|Compassvale}} ► {{Stn|Ranggung}} ► {{Stn|Sengkang}}||
|-
|-
|D||{{STN|L|Sengkang}} ► {{STN|L|Renjong}} ► {{STN|L|Cheng Lim}} ► {{STN|L|Sengkang}}||
|D||{{Stn|Sengkang}} ► {{Stn|Ranggung}} ► {{Stn|Compassvale}} ► {{Stn|Sengkang}}||
|}
|}


==Rolling stock==
==Rolling stock==
The rolling stock consists of [[Mitsubishi Heavy Industries C810]] and [[Mitsubishi Heavy Industries C810A]] trains. These trains operate from [[Sengkang Depot]] near Tongkar Station.
The rolling stock consists of [[Mitsubishi Heavy Industries 810]] and [[Mitsubishi Heavy Industries 810A]] trains. These trains operate from [[Sengkang Depot]] near {{Stn|Tongkang| Station}}.


==References==
==References==
Line 133: Line 88:


{{Light Rail Transit}}
{{Light Rail Transit}}
{{Railway Lines in Singapore}}
{{Railway Lines}}
{{Sengkang LRT}}
{{Sengkang LRT}}
[[Category:Light Rail Transit Lines]]

Latest revision as of 22:39, 5 March 2024


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service on the East–West Line between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Saturday, 30 November, Services , , , , /, , , , , , , , , , , , , , , , , , , , , , , , / & will be diverted to travel on alternative routes from the First Bus to 11.45am. They will skip bus stops along their regular routes, which will include Bayfront Avenue, Beach Road, Nicoll Highway as well as those in the Civic District, Central Business District and Marina Central.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

SBS Transit SMRT Buses Go-Ahead Tower Transit
  • On Sunday, 1 December, from the First Bus to 3.00pm, Services , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , & will be similarly affected by lane/road closures with bus stops skipped along their regular routes. The affected roads include Bayfront Avenue, Beach Road, Nicoll Highway, Fort Road and Keppel Road as well as those in the Civic District, Central Business District and Marina Central.
  • With the road closures on 1 December, Service will also commence operations at a later time at 12.00pm. Service will be diverted from its regular route along the ECP (towards Bedok North Depot) from the start of operations to 10.30am. However, no bus stops will be skipped. *Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses
    • Go-Ahead
    • Tower Transit

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

SK
Sengkang LRT
盛港轻轨
செங்காங் லைட் ரெயில்
Statistics
Status Operational
Termini Sengkang
Stations 14
Services 4
Operator(s) SBS Transit
Rolling stock 810, 810A
Line length 10.6 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Sengkang LRT (SKLRT) is the second Light Rail Transit (LRT) line. The line is currently 10.6 km long with 14 stations and it is fully automated.

History[edit]

Date Event
18 January 2003 Sengkang, Compassvale - Ranggung
29 January 2005 Thanggam - Renjong
15 November 2007 Farmway
4 January 2010 West Loop operated in both direction during weekdays peak hours
1 January 2013 Cheng Lim
West Loop operated in both direction throughout the day
27 June 2015 Kupang
22 December 2015 Two-car trains started operation

Stations[edit]

Alpha-Numeric
Code
Station Name Image Working names Notes
icon Sengkang LRT
STCNE16 Sengkang Sengkang-SKLRT.png Sengkang Terminus
Interchange with North East Line
icon Sengkang LRT (East Loop)
SE1 Compassvale Compassvale-SKLRT.png Compassvale
SE2 Rumbia Rumbia-SKLRT.png Rumbia
SE3 Bakau Bakau-SKLRT.png Bakau
SE4 Kangkar Kangkar-SKLRT.png Kangkar
SE5 Ranggung Ranggung-SKLRT.png Ranggung
icon Sengkang LRT (West Loop)
SW1 Cheng Lim Cheng Lim-SKLRT.png Cheng Lim
SW2 Farmway Farmway-SKLRT.png Farmway
SW3 Kupang Kupang-SKLRT.png Kupang
SW4 Thanggam Thanggam-SKLRT.png Thanggam
SW5 Fernvale Fernvale-SKLRT.png Fernvale
SW6 Layar Layar-SKLRT.png Layar
SW7 Tongkang Tongkang-SKLRT.png Tongkang
SW8 Renjong Renjong-SKLRT.png Renjong

Services[edit]

Service Route Notes
A SengkangRenjongCheng LimSengkang
B SengkangCheng LimRenjongSengkang
C SengkangCompassvaleRanggungSengkang
D SengkangRanggungCompassvaleSengkang

Rolling stock[edit]

The rolling stock consists of Mitsubishi Heavy Industries 810 and Mitsubishi Heavy Industries 810A trains. These trains operate from Sengkang Depot near Tongkang Station.

References[edit]


icon Light Rail Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines Bukit Panjang LRTSengkang LRTPunggol LRT
Rolling Stocks 801801A801B810810A
Future810D
Depots SengkangTen Mile Junction
Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
icon Sengkang LRT [ VTE ]
Stations Sengkang
East LoopCompassvaleRumbiaBakauKangkarRanggung
West LoopCheng LimFarmwayKupangThanggamFernvaleLayarTongkangRenjong
Rolling Stock 810810A810D
Depots Sengkang
Others Bridging Service