Difference between revisions of "Kaki Bukit station"

From SgWiki
Jump to navigation Jump to search
m
Line 7: Line 7:
  {{Infoline|Address|30 Kaki Bukit Avenue 1<br>Singapore 415804}}
  {{Infoline|Address|30 Kaki Bukit Avenue 1<br>Singapore 415804}}
  {{Infoline|Line(s)|{{DTL}}}}
  {{Infoline|Line(s)|{{DTL}}}}
{{Infoline|Structure|Underground}}
  {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}}
  {{Infoline|Connections|[[File:Bus Logo.png|25px|link=|alt=Bus]] [[File:Taxi Logo.png|25px|link=|alt=Taxi]]}}
  {{Infoline|Abbreviation|KKB}}
  {{Infoline|Abbreviation|KKB}}
}}
}}


'''Kaki Bukit (DT28)''' is an underground [[Mass Rapid Transit]] (MRT) station on the {{DTL}}.
'''Kaki Bukit (DT28)''' is a [[Mass Rapid Transit]] (MRT) station on the {{DTL}}.


==History==
==History==
Line 17: Line 18:
!width=150|Date!!Event
!width=150|Date!!Event
|-
|-
|21 October 2017||Station officially opens
|21 October 2017||Station officially opens<ref>[//www.lta.gov.sg/content/ltagov/en/newsroom/2017/5/2/factsheet-downtown-line-3-to-open-on-21-october-2017.html "Factsheet: Downtown Line 3 to Open on 21 October 2017"]. Land Transport Authority (31 May 2017).</ref>
|}
|}



Revision as of 14:32, 24 July 2020


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Template:Code/1
Kaki Bukit
加基武吉
காக்கி புக்கிட்
Kaki Bukit-DTL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 30 Kaki Bukit Avenue 1
Singapore 415804
Line(s) Downtown Line
Structure Underground
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation KKB

Kaki Bukit (DT28) is a Mass Rapid Transit (MRT) station on the Downtown Line.

History

Date Event
21 October 2017 Station officially opens[1]

Artworks

  • DT28-Welcome to Kaki Bukit.png
    Downtown Line: Welcome to Kaki Bukit by Hans Tan
    The artist invited a diverse community of residents, workers and students around the station to write “Welcome to Kaki Bukit” while filming their every hand-motion while writing. These handwritten messages create a dynamic digital welcome signage that greets commuters as they descend the escalators.[2]

Layout

L1 Street Level
B1 Underpass
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B3 Template:Route/2
Platform A/B
Template:Route/1

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Kaki Bukit Avenue 1
B Handicapped/disabled access Kaki Bukit Avenue 1, Jalan Damai, Bedok North Secondary School

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png Downtown Line
DT1Bukit Panjang 05:52 05:52 06:10 23:56
DT35Expo 06:07 06:07 06:27 00:26

Bus

Bus Stop Exit Bus Service
72039 Kaki Bt Stn Exit A
72041 Blk 660A CP

References

  1. "Factsheet: Downtown Line 3 to Open on 21 October 2017". Land Transport Authority (31 May 2017).
  2. "Art in Transit". Land Transport Authority. Retrieved 22 June 2020.
icon Downtown Line [ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service