Difference between revisions of "Light Rail Transit"
m |
m |
||
Line 3: | Line 3: | ||
|Line=LTA | |Line=LTA | ||
|Name=Light Rail Transit | |Name=Light Rail Transit | ||
|Img={{Icon|LRT|W|70px|a=LRT|o= | |Img={{Icon|LRT|W|70px|a=LRT|o={{CSS/LTA|s=|f=}}}} | ||
|Info= | |Info= | ||
{{Infoline|Owner|Land Transport Authority}} | {{Infoline|Owner|Land Transport Authority}} |
Revision as of 08:07, 26 February 2022
!
|
TRAVEL ADVISORY | !
| ||||
---|---|---|---|---|---|---|
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
|
Light Rail Transit | |
Statistics | |
---|---|
Owner | Land Transport Authority |
Operator(s) | |
Number of lines | 3 |
Number of stations | 41 |
System length | 27.9 km |
The Light Rail Transit (LRT), is a series of localised automated guideway transit systems acting as feeder services to the heavy rail Mass Rapid Transit, which together forms the core of rail transport services. The first LRT line was opened in 1999 and the system has since expanded to three lines, each serving a public housing estate, namely Bukit Panjang, Sengkang and Punggol. Trains on these lines have at least one station linking it to the MRT and in turn the remainder of the LRT network.
History
In September 1991, the Urban Redevelopment Authority (URA) unveiled the revised Concept Plan 1991, which proposed a new mode of feeder rail that could serve new towns such as Yishun and Tampines. Such systems were to be fully automated and elevated light rail systems to serve as faster alternatives to existing feeder buses.[1]
In 1996, the Land Transport Authority (LTA) published a White Paper which outlined its goals for a world-class transport system in Singapore, one of which was the utilisation of LRT systems as feeder services to the MRT network, and the integration of LRT facilities with HDB estates to maximise convenience for residents.[1]
The concept of having rail lines which could bring people from door to door without requiring the use of road-based buses was much favoured by the government transport planners, especially with the increased emphasis on a rail-based public transport network. For intra town travel, LRTs were favoured over buses because trains run on dedicated elevated guideways, bypassing any traffic congestion and traffic lights on the roads, and do not add to road traffic. Train arrival and departure times are also almost guaranteed this way. It is also cleaner as the trains are electrically powered, and therefore lessens the effects of air pollution.
Infrastructure
Line | Commencement | Latest extension | Terminus | Stations | Length (km) | Rolling Stocks | Depot | Operator | Control Center |
---|---|---|---|---|---|---|---|---|---|
Bukit Panjang LRT | 6 November 1999 | N/A | Choa Chu Kang | 13 | 7.7 | C801 C801A |
Ten Mile Junction Depot | Ten Mile Junction Depot | |
Sengkang LRT | 18 January 2003 | 2015 | Sengkang | 14 | 10.6 | C810 C810A |
Sengkang Depot | Sengkang Depot | |
Punggol LRT | 29 January 2005 | 2017 | Punggol | 14 | 9.6 |
References
- ↑ 1.0 1.1 "Infopedia: First Light Rail Transit System". National Library Board. Retrieved 26 October 2019.
Railway Lines in Singapore | [ V • T • E ] | |
---|---|---|
Mass Rapid Transit (MRT) | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Light Rail Transit (LRT) | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Cross-border | KTM Intercity | |
FutureJohor Bahru–Singapore Rapid Transit System | ||
Others | Changi Airport Skytrain • Sentosa Express | |
DefunctSentosa Monorail |
Light Rail Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | Bukit Panjang LRT • Sengkang LRT • Punggol LRT | |
Rolling Stocks | 801 • 801A • 801B • 810 • 810A | |
Future810D | ||
Depots | Sengkang • Ten Mile Junction |