Tan Kah Kee station

From SgWiki
Jump to navigation Jump to search


!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train Services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

Land Transport Authority SMRT Trains
  • From Saturday, 7 December 2024 to 10 December 2024. There will be no train service between Tampines station and Tanah Merah station with Simei station being closed. This is to prepare for the opening of the new East Coast Integrated Depot (ECID) in 2026, LTA and SMRT will be undertaking a series of works to facilitate the connection of tracks from the existing East–West Line to the ECID. Shuttle Buses will be operating at intervals of 5 mins.
  • Please refer
    • here for more information on the adjustments.
    • here for Shuttle Bus and Train arrangements.
    • here for the work map.

Land Transport Authority SBS Transit

Land Transport Authority SBS Transit
  • From Sunday, 24 November 2024, Bus Services , & will call at new bus stops.
  • Please refer here for more information.

SBS Transit
On Sunday, 24 November 2024, Bus Services , , & will be affected by road closure on Nicoll Highway from the First Bus to 10.00am. Please refer here for more information.
Land Transport Authority Tower Transit
  • From Monday, 25 November 2024, City Direct Service will be introduced from Tengah Drive to the Central Business District (CBD), operating during morning and evening peak hours. Please refer here for more information.

Land Transport Authority Go-Ahead
  • From Monday, 25 November 2024, City Direct Service will be extended to Bayfront Avenue, Temasek Avenue, Temasek Boulevard and Raffles Boulevard. An additional trip will operate during morning peak period and its frequency will be improved from 15 minutes to 10 minutes. Please refer here for more information.

Land Transport Authority SBS Transit SMRT Buses
  • From Sunday, 1 December 2024, Compassvale Bus Interchange will close following the opening of Buangkok Bus Interchange. Bus Services , & will be amended to operate from Buangkok Bus Interchange while Bus Service will be amended to operate from Sengkang Interchange.
  • Please refer to the following for more information.
    • SBS Transit
    • SMRT Buses

Land Transport Authority Go-Ahead
  • From Sunday, 8 December 2024, Bus Services & will each call at an additional bus stop outside and opposite Blk 437B respectively. Please refer here for more information.

Land Transport Authority SBS Transit
  • From Monday, 9 December 2024, Supplementary Bus Service will be introduced to provide a faster connection to the Tampines town centre and transport hub for residents in the Tampines North and west areas. Please refer here for more information.

Template:Code/1
Tan Kah Kee
陈嘉庚
டான் கா கீ
Tan Kah Kee-DTL.png
*Graphic From SGTrains/Wikipedia/LTA
Statistics
Address 651 Bukit Timah Road
Singapore 266268
Line(s) Downtown Line
Connections File:Bus Logo.png File:Taxi Logo.png
Abbreviation TKK

Tan Kah Kee (DT8) is an underground Mass Rapid Transit (MRT) station on the Downtown Line.

History

Date Event
27 December 2015 Station officially opens

Cracks appearing on homes near the station

The Land Transport Authority has taken steps to repair damages to at least 40 Watten Estate homes, believed to be linked to the construction of the Downtown Line. Residents of the terraced and semi-detached houses at Bukit Timah complained that they began noticing hairline cracks in walls inside and outside their homes between July and August 2012. They added that cracks began widening in those weeks. Besides cracks, some car porch roofs and walls had shifted, and some gates could no longer open. The houses in the upscale neighbourhood where home prices start in the millions, are across from the site of the upcoming Tan Kah Kee station. Checks were made by LTA and the houses were found to be structurally safe.[1]

Artworks

  • Downtown Line: 饮水思源 & 自强不息 (Gratitude & Resilience) by Hwa Chong Institution
    The Chinese idiom for resilience (自强不息) dissolves into bands of white and yellow to form a blazing sun that shares its light through thick and thin. The words for gratitude (饮水思源) are presented in blue and green, symbolising a running river that connects us to our history and cultural heritage.[2]

Layout

L2 Overhead Bridge
L1 Street Level Hwa Chong Institution
B1 Concourse Faregates, Ticketing Machines, Passenger Service Centre
B2 Template:Route/1
Platform A/B
Template:Route/2

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Bukit Timah Road, Hwa Chong Institution
B Handicapped/disabled access Dunearn Road

Transport Services

First/Last Train Timing

Destination First Train Last Train
Mon − Fri Sat Sun & P.H. Daily
File:MRTFFF.png Downtown Line
DT1Bukit Panjang 06:02 06:02 06:23 00:34
DT35Expo 05:44 05:44 06:04 23:49

Bus

Bus Stop Exit Bus Service
41051 Tan Kah Kee Stn
41069 Opp Tan Kah Kee Stn

References

  1. "MRT works cause cracks in Bukit Timah homes". The Straits Times. Retrieved 16 April 2013.
  2. "Art in Transit". Land Transport Authority. Retrieved 22 June 2020.
icon Downtown Line [ VTE ]
Stations Bukit PanjangCashewHillviewHumeBeauty WorldKing Albert ParkSixth AvenueTan Kah KeeBotanic GardensStevensNewtonLittle IndiaRochorBugisPromenadeBayfrontDowntownTelok AyerChinatownFort CanningBencoolenJalan BesarBendemeerGeylang BahruMattarMacPhersonUbiKaki BukitBedok NorthBedok ReservoirTampines WestTampinesTampines EastUpper ChangiExpo
DTL3eXilinSungei Bedok
Rolling Stock 951
Depots Gali BatuKim ChuanEast Coast
Others Bridging Service