Difference between revisions of "Changi Airport Skytrain"

From SgWiki
Jump to navigation Jump to search
m
Line 64: Line 64:
!Type!!Ply Between!!Notes
!Type!!Ply Between!!Notes
|-
|-
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 2}}||PMS North only.
|Both||{{Stn|Station D}} (T1) ↔ {{Stn|Station E}} (T2)||PMS North only.
|-
|-
|Both||{{Stn|Terminal 1}} ↔ {{Stn|Terminal 3}}||PMS North only.
|Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station C}} (T1)||PMS North only.
|-
|-
|Both||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||
|Both||{{Stn|Station B}} (T3) ↔ {{Stn|Station E}} (T2)||
|-
|-
|Transit||{{Stn|Terminal 2}} ↔ {{Stn|Terminal 3}}||PMS South only.
|Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station F}} (T2)||PMS South only.
|-
|-
|Transit||{{Stn|Terminal 3}} ↔ {{Stn|Terminal 3}} (South)||PMS South only.
|Transit||{{Stn|Station A}} (T3) ↔ {{Stn|Station A (South)}} (T3)||PMS South only.
|}
|}



Revision as of 08:36, 23 July 2020


!
TRAVEL ADVISORY
!
Land Transport Authority SMRT
  • Train services between Tanjong Rhu and Bayshore stations (Thomson–East Coast Line Stage 4) will begin on Sunday, 23 June 2024. Free rides are available between those stations on Friday, 21 June 2024. Please refer here for more information.

Land Transport Authority SMRT
  • To facilitate testing on new trains, from 22 March 2024 to 30 June 2024, train service on the Bukit Panjang LRT will end earlier at 10.30pm on Fridays, Saturdays, and Sundays. Please refer here for more information.

SBS Transit
  • From Monday, 13 May 2024, short-trip service
    168A
    will be introduced, plying from Woodlands Int to Tampines Ave 4 (Opp Tampines Stn/Int). It will operate during the morning and evening peak period on Weekdays and Saturdays. Please refer here for more information.

SBS Transit
  • From Sunday, 19 May 2024, The first bus timing for service
    168
    from Woodlands Interchange will be brought forward on Sundays & Public Holidays to 0545hrs. Please refer here for more information.

SBS Transit Tower Transit
  • Due to upgrading works at Boon Lay Interchange, from Sunday, 26 May 2024,
    • Bus service
      79
      will be amended to start from Jurong Town Hall Int and loop at Boon Lay Int via Jurong West St 64.
    • Bus service
      252
      will be amended to enter Boon Lay Int via Jurong West St 64.
  • Please refer to the following for more information.

Changi Airport Skytrain
CAS Logo.png
Statistics
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to CG21Changi Airport
C 1
D 1
E 2 Linked to CG21Changi Airport
F 2 Transit only

Services

Type Ply Between Notes
Both Station D (T1) ↔ Station E (T2) PMS North only.
Both Station B (T3) ↔ Station C (T1) PMS North only.
Both Station B (T3) ↔ Station E (T2)
Transit Station A (T3) ↔ Station F (T2) PMS South only.
Transit Station A (T3) ↔ Station A (South) (T3) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover