Changi Airport Skytrain

From SgWiki
Jump to navigation Jump to search
!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Monday, 26 May 2025, bus service 671 will operate additional morning and evening trips. Please refer here for more information.

SBS Transit
  • From Sunday, 8 June 2025, bus service 135 will serve a new pair of bus stops along Haig Road. Please refer here for more information.

SBS Transit
  • From Sunday, 8 June 2025, supplementary bus service 230M will be introduced to better serve residents travelling to the Kim Keat Avenue. This service will operate at a frequency of 15 minutes from Toa Payoh Bus Interchange. Please refer here for more information.
Changi Airport Skytrain
Train Line Information
Status Operational
Stations 7
Services 5
Operator(s) Changi Airport Group
Rolling stock Crystal Mover
Line length 6.4 km
Track gauge 1,850 mm broad gauge
Electrification 750V DC Third rail

Changi Airport Skytrain is a people mover system that connects Terminals 1, 2 and 3 of Singapore Changi Airport.

History

Date Event
1990 Terminal 1 - Terminal 2
March 2006 Replacement of C-100 trains to Crystal Movers
November 2007 Terminal 3
Opening of PMS South
24 February 2015 Suspension of PMS North (Terminal 2 - Terminal 3)
12 April 2019 Resumption of PMS North (Terminal 2 - Terminal 3)
1 May 2020 Temporary closure of Terminal 2 stations

Stations

Station Terminal Notes
Changi Airport Skytrain
A 3 Transit only
A (South) 3 Transit only
B 3 Linked to
C 1
D 1
E 2 Linked to
F 2 Transit only

Services

Type Ply Between Notes
Both Station D (T1) ↔ Station E (T2) PMS North only.
Both Station B (T3) ↔ Station C (T1) PMS North only.
Both Station B (T3) ↔ Station E (T2)
Transit Station A (T3) ↔ Station F (T2) PMS South only.
Transit Station A (T3) ↔ Station A (South) (T3) PMS South only.

Rolling stock

The rolling stock consists of Crystal Mover trains. These trains operate from two depots along the line at either side of the system.

References


Railway Lines in Singapore [ VTE ]
Mass Rapid Transit (MRT) North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line
FutureJurong Region LineCross Island Line
Light Rail Transit (LRT) Bukit Panjang LRTSengkang LRTPunggol LRT
Cross-border KTM Intercity
FutureJohor Bahru–Singapore Rapid Transit System
Others Changi Airport SkytrainSentosa Express
DefunctSentosa Monorail • Jurong Bird Park Panorail
Changi Airport Skytrain [ VTE ]
Stations Station AStation A (South)Station BStation CStation DStation EStation F
Rolling Stock Adtranz C-100 (Former) • Mitsubishi Heavy Industries Crystal Mover