Difference between revisions of "Bishan Depot"
m (→Related Links) |
|||
Line 1: | Line 1: | ||
Coordinates | {|class="wikitable" border="1" cellpadding="2" style="float:right" | ||
|colspan="2" style="text-align:center"|<big>'''Bishan Depot'''</big><br><big>'''碧山车厂'''</big> | |||
|- | |||
!style="text-align:left" valign="top"|Address | |||
|valign="top"|300 Bishan Road, Singapore 579828 | |||
|- | |||
!style="text-align:left" valign="top"|Coordinates | |||
|valign="top"|1°21′19.03″N, 103°51′14.43″E | |||
|- | |||
!style="text-align:left" valign="top"|Operator | |||
|valign="top"|[[SMRT Corporation]] | |||
|- | |||
!style="text-align:left" valign="top"|Line(s) | |||
|valign="top"|[[North South Line]] and [[East West Line]] | |||
|- | |||
!style="text-align:left" valign="top"|Capacity | |||
|valign="top"|53 trains | |||
|- | |||
!style="text-align:left" valign="top"|Area | |||
|valign="top"|300,000m² | |||
|} | |||
'''Bishan Depot | '''Bishan Depot''' is a [[Mass Rapid Transit (Singapore)|MRT]] depot operated by SMRT Corporation, located at Bishan along the [[North South Line]]. | ||
It | It houses a central maintenance with train overhaul facilities for trains on the [[North South Line]] and [[East West Line]]. It is also a school for newly recruited staff to train them in their assigned job and it is where the faregate operation department is located. The rolling stock workshop and Tracks 10 to 12 are the locations where the refurbishment of the [[Kawasaki Heavy Industries C151]] trains takes place. | ||
The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million. | The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million. | ||
==SMRT Cram Jam!== | ==SMRT Cram Jam!== | ||
On the 11 February 2007, SMRT Organized the ''SMRT Cram Jam! cum Learning Journey and Charity Bazaar'' to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book Of Records by cramming people inside a | On the 11 February 2007, SMRT Organized the ''SMRT Cram Jam! cum Learning Journey and Charity Bazaar'' to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book Of Records by cramming people inside a [[Kawasaki Heavy Industries C151]] Car 2027, a [[Mercedes-Benz O405G (Hispano Habit)]] Bus, TIB1202K and a Ssangyong Rodius/Stavic MPV Cab. The Singapore Police Force crammed 550 officers inside the train car, 235 staff from SMRT crammed inside the bus and an amazing 44 Girl Guides Singapore Cadets crammed themselves into the cab. Games and Carnival Food were organized and a 90-minute tour around the Bishan Depot. | ||
==Incidents== | ==Incidents== | ||
An MRT train | An MRT train, [[C751B - 311/312|C751B 311/312]] has been vandalised in an apparent security breach at a depot. The train was then put into service before the vandalism was discovered. | ||
LTA said that SMRT failed to detect, in a timely manner, the security breach at its Bishan depot and the graffiti on one of its MRT trains on 17 August 2011 and the transport company was fined for the security breach. < | LTA said that SMRT failed to detect, in a timely manner, the security breach at its Bishan depot and the graffiti on one of its MRT trains on 17 August 2011 and the transport company was fined for the security breach. <ref>[http://sg.news.yahoo.com/blogs/singaporescene/vandals-breach-bishan-depot-smrt-train-vandalised-155409194.html "SMRT Bishan depot breached, train vandalised".] Yahoo News Singapore</ref> | ||
==Upgrading== | ==Upgrading== | ||
On 7 March 2012, Minister for Transport, Mr Lui Tuck Yew, announced on Committee of Supply Debate 2012 in Parliament that upgrading of existing | On 7 March 2012, Minister for Transport, Mr Lui Tuck Yew, announced on Committee of Supply Debate 2012 in Parliament that upgrading of existing [[North South Line]] and [[East West Line]] depots to be started and completed by 2014. <ref>[http://app.lta.gov.sg/apps/news/page.aspx?c=2&id=fdc266a2-9528-4c6b-84b6-ffef372a3114 "LTA and SMRT Improve Train Maintenance and Incident Management"] Land Transport Authority</ref> | ||
==References== | ==References== | ||
<references/> | |||
==Related Links== | ==Related Links== |
Revision as of 22:18, 23 December 2013
Bishan Depot 碧山车厂 | |
Address | 300 Bishan Road, Singapore 579828 |
---|---|
Coordinates | 1°21′19.03″N, 103°51′14.43″E |
Operator | SMRT Corporation |
Line(s) | North South Line and East West Line |
Capacity | 53 trains |
Area | 300,000m² |
Bishan Depot is a MRT depot operated by SMRT Corporation, located at Bishan along the North South Line.
It houses a central maintenance with train overhaul facilities for trains on the North South Line and East West Line. It is also a school for newly recruited staff to train them in their assigned job and it is where the faregate operation department is located. The rolling stock workshop and Tracks 10 to 12 are the locations where the refurbishment of the Kawasaki Heavy Industries C151 trains takes place.
The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.
SMRT Cram Jam!
On the 11 February 2007, SMRT Organized the SMRT Cram Jam! cum Learning Journey and Charity Bazaar to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book Of Records by cramming people inside a Kawasaki Heavy Industries C151 Car 2027, a Mercedes-Benz O405G (Hispano Habit) Bus, TIB1202K and a Ssangyong Rodius/Stavic MPV Cab. The Singapore Police Force crammed 550 officers inside the train car, 235 staff from SMRT crammed inside the bus and an amazing 44 Girl Guides Singapore Cadets crammed themselves into the cab. Games and Carnival Food were organized and a 90-minute tour around the Bishan Depot.
Incidents
An MRT train, C751B 311/312 has been vandalised in an apparent security breach at a depot. The train was then put into service before the vandalism was discovered.
LTA said that SMRT failed to detect, in a timely manner, the security breach at its Bishan depot and the graffiti on one of its MRT trains on 17 August 2011 and the transport company was fined for the security breach. [1]
Upgrading
On 7 March 2012, Minister for Transport, Mr Lui Tuck Yew, announced on Committee of Supply Debate 2012 in Parliament that upgrading of existing North South Line and East West Line depots to be started and completed by 2014. [2]
References
- ↑ "SMRT Bishan depot breached, train vandalised". Yahoo News Singapore
- ↑ "LTA and SMRT Improve Train Maintenance and Incident Management" Land Transport Authority
Related Links
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line
FutureJurong Region Line • Cross Island Line | |
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 751A • 751B • 751C • 830 • 830C • 851E • 951
Former651 Future J151 • CR151 | |
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
Future Changi East • East Coast • Tengah |