Difference between revisions of "Changi Airport station"

From SgWiki
Jump to navigation Jump to search
m (Reverted edits by TheFlyingDutchman (talk) to last revision by Supernutorcrazy)
Line 81: Line 81:
|- valign=top
|- valign=top
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
!width=240|Bus Stop!!width=30|Exit!!width=300|Bus Service
{{BusGuide|95129|Changi Airport PTB2|A}}{{Bus|24|808}} {{Bus|27|808}} {{Bus|34|EC0|D22}} {{Bus|36|EC0|D22}} {{Bus|53|808}} <!---{{Bus|110|F00}}---> {{Bus|858|F00}}
{{BusGuide|95129|Changi Airport PTB2|A}}{{Bus|24|808}} {{Bus|27|808}} {{Bus|34|EC0|D22}} {{Bus|36|EC0|D22}} {{Bus|53|808}} {{Bus|858|F00}}
{{BusGuide|95109|Changi Airport PTB3|B}}{{Bus|24|808}} {{Bus|27|808}} {{Bus|34|EC0|D22}} {{Bus|36|EC0|D22}} {{Bus|53|808}} <!---{{Bus|110|F00}}---> {{Bus|858|F00}}
{{BusGuide|95109|Changi Airport PTB3|B}}{{Bus|24|808}} {{Bus|27|808}} {{Bus|34|EC0|D22}} {{Bus|36|EC0|D22}} {{Bus|53|808}} {{Bus|858|F00}}
|}
|}



Revision as of 22:21, 6 September 2017

!
TRAVEL ADVISORY
!
SMRT Trains
  • From Sunday, 14 November 2024 to 31 October 2025, Train services on the Bukit Panjang LRT will end an hour earlier at 22:30 every Thursday to Sunday (except Public Holidays). This is to facilitate the upgrading of the BPLRT signalling system, as well as the testing of the new and retrofitted Light Rail Vehicles (LRVs) on the BPLRT network. Please refer here for more information.

SBS Transit
  • From Saturday, 15 March 2025, supplementary bus service 138M will be introduced to better serve residents travelling to the Ang Mo Kio Polyclinic. This service will operate at a frequency of 30 minutes from Ang Mo Kio Bus Interchange. Please refer here for more information.

Tower Transit
  • From Saturday, 15 March 2025, bus service 883M will operate on Saturdays from 7am to 1pm at 30-minute frequency to enhance connectivity to amenities along Yishun Avenue 7. Please refer here for more information.

SBS Transit
  • From Monday, 17 March 2025, short-trip service 71A will be introduced from Mayflower MRT Station to Bishan MRT Station. Please refer here for more information.

SMRT Buses
  • From Sunday, 23 March 2025, supplementary bus service 258M will ply an extended route looping at Boon Lay Place to provide direct connection to amenities such as Boon Lay Shopping Centre. Please refer here for more information.

SMRT Buses
  • From Monday, 24 March 2025, supplementary bus service 979X will be introduced to provide a faster connection for residents in Yew Tee Village to and from Bukit Panjang MRT / Bus Interchange. Bus service 979X will supplement bus service 979 and serve selected bus stops along its route. It will operate on weekdays (excluding Public Holidays) during the morning and evening peak periods. Please refer here for more information.

Tower Transit
  • From Monday, 24 March 2025, supplementary bus service 861M will be introduced to complement existing travel options to Wellington Primary School. It will operate from Canberra Way, terminating at Sembawang Bus Interchange. This service will operate two trips during the morning peak period on weekdays during school term only. Please refer here for more information.

SBS Transit
  • From Monday, 24 March 2025, short-trip service 112B will be introduced starting from Hougang Central Bus Interchange and terminating at Hougang Avenue 7. This service will only operate on weekdays (excluding public holidays) during the evening peak period. Please refer here for more information.

Changi Airport
樟宜机场
சாங்கி விமானநிலையம்

1
Changi Airport-EWL.png
*Graphic From SGTrains/Wikipedia/LTA
Station Information
Address 70 Airport Boulevard
Singapore 819661
Line(s) East–West Line
Connections Bus, Taxi
 

 

 

 

Changi Airport (CG2) is an underground Mass Rapid Transit (MRT) station on the East–West Line.

History

Date Event
8 February 2002 Station officially opens

Train services were initially operated as a through service from Boon Lay station when this station opened. However, to cut costs due to low ridership, it was reverted into shuttle service on 22 July 2003.

Station Planning

The earlier plans had long been made for a new line branching off from the existing East West Line at Tanah Merah station with some conceptual plans showing a tentative route alignment up to the airport and continuing towards the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.

The final plan involved building only the first two stations, namely Expo and Changi Airport. The alignment of the station at the airport has been switched perpendicularly to an east–west direction, such that the station leads to two of the terminals directly from either end of the station.

Layout

L2 Departure Hall Changi Airport Skytrain
L1 Arrival Hall
Street Level Changi Airport
B1 Link Bridge Changi Airport PTB Bus Terminal, Link bridge between Terminal 2 and 3
B2 Concourse Faregates, Ticketing Machines, Passenger Service Centre, Transitlink Ticket Office
Platform A East–West Line
Template:Terminus
Platform A/B
Platform B East–West Line
Template:Terminus

Exits

Exit Disabled-Access Location/Nearby
A Handicapped/disabled access Changi Airport Terminal 2
B Handicapped/disabled access Changi Airport Terminal 3

Transport Services

Rail

Template:Rail Head Template:Rail Line Template:Rail Service |}

Notes:: Last connecting train to Joo Koon will departs at 23:18.

Bus

Bus Stop Exit Bus Service
95129
Changi Airport PTB2
24 27 34 36 53 858
95109
Changi Airport PTB3
24 27 34 36 53 858

References


Template:Singapore MRT stations Template:East West Line