Difference between revisions of "Kawasaki Heavy Industries & CRRC Qingdao Sifang 151C"
Jump to navigation
Jump to search
m (→References) |
m |
||
Line 4: | Line 4: | ||
|Image Description= | |Image Description= | ||
|Info 1= | |Info 1= | ||
{{Infobox | | {{Infobox|Manufacturer|Kawasaki Heavy Industries<br>CSR Qingdao Sifang}} | ||
{{Infobox | | {{Infobox|Built at|Qingdao, Shandong, China}} | ||
{{Infobox | | {{Infobox|Constructed|2017 - 2019}} | ||
{{Infobox | | {{Infobox|Number built|72 cars (12 Trains)}} | ||
{{Infobox | | {{Infobox|Formation|6 cars per train<br>(DT−M1−M2−M2−M1−DT)}} | ||
{{Infobox | | {{Infobox|Capacity|1920 passengers}} | ||
{{Infobox | | {{Infobox|Operator|{{SMRT}}}} | ||
{{Infobox | | {{Infobox|Depot(s)|[[Bishan Depot|Bishan]], [[Changi Depot|Changi]], [[Tuas Depot|Tuas]] and [[Ulu Pandan Depot|Ulu Pandan]]}} | ||
{{Infobox | | {{Infobox|Line(s) served|{{NSL}}<br>{{EWL}}}} | ||
|Info 2= | |Info 2= | ||
{{Infobox | | {{Infobox|Car body construction|Aluminium-alloy double-skinned construction}} | ||
{{Infobox | | {{Infobox|Car length|23.83 m (DT)<br>22.8 m (M1/M2)}} | ||
{{Infobox | | {{Infobox|Width|3.2 m}} | ||
{{Infobox | | {{Infobox|Height|3.7 m}} | ||
{{Infobox | | {{Infobox|Doors|1.45 m, 8 per car}} | ||
{{Infobox | | {{Infobox|Maximum speed|90 km/h (design)<br>80 km/h (service)}} | ||
{{Infobox | | {{Infobox|Electric system(s)|750 V DC 3rd rail}} | ||
{{Infobox | | {{Infobox|Safety system(s)|CBTC/ATO, ATP, ATC, CBI (Thales SelTrac)}} | ||
{{Infobox | | {{Infobox|Track gauge|1,435 mm standard gauge}} | ||
}} | }} | ||
Revision as of 13:07, 20 March 2016
Kawasaki Heavy Industries & CSR Qingdao Sifang C151C are the sixth generation of trains to be used on the North South Line and the East West Line.
History
In the turnkey Contract C151C, 3 tenderers submitted bids – Kawasaki Heavy Industries, CSR Zhuzhou and Hyundai Rotem. On 22 September 2015, the Land Transport Authority (LTA) announced that it has awarded the tender to Kawasaki Heavy Industries/CSR Qingdao Sifang at a price of S$136.8 million.[1][2]
New features
The C151C will be the first MRT rolling stock on the North South East West Line to be fitted with fold-up seats[1]
References
- ↑ 1.0 1.1 "12 More Trains to Boost Capacity of North-South and East-West Lines". Land Transport Authority (22 Sep 2015)
- ↑ "Kawasaki clinches contract for final batch of new MRT trains". Christopher Tan (Straits Times, 22 Sep 2015). Retrieved 22 Sep 2015.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 651 • 751A • 751B • 751C • 830 • 830C • 851E • 951 | |
FutureJ151 • CR151 | ||
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
FutureChangi East • East Coast • Tengah |