Kawasaki Heavy Industries & CRRC Qingdao Sifang 151C
Revision as of 20:08, 3 December 2015 by Supernutorcrazy (talk | contribs) (Protected "Kawasaki Heavy Industries & CSR Qingdao Sifang C151C" ([Edit=Allow only autoconfirmed users] (indefinite) [Move=Allow only autoconfirmed users] (indefinite)))
Kawasaki Heavy Industries & CSR Qingdao Sifang C151C are the sixth generation of trains to be used on the North South Line and the East West Line.
History
In the turnkey Contract C151C, 3 tenderers submitted bids – Kawasaki Heavy Industries, CSR Zhuzhou and Hyundai Rotem. On 22 September 2015, the Land Transport Authority (LTA) announced that it has awarded the tender to Kawasaki Heavy Industries/CSR Qingdao Sifang at a price of S$136.8 million.[1][2]
New features
The C151C will be the first MRT rolling stock on the North South East West Line to be fitted with fold-up seats[1]
References
- ↑ 1.0 1.1 "12 More Trains to Boost Capacity of North-South and East-West Lines". Land Transport Authority (22 Sep 2015)
- ↑ "Kawasaki clinches contract for final batch of new MRT trains". Christopher Tan (Straits Times, 22 Sep 2015). Retrieved 22 Sep 2015.
Mass Rapid Transit | [ V • T • E ] | |
---|---|---|
Overview | History • Stations • Fare and Ticketing • Facilities • Safety • Security | |
Lines | North–South Line • East–West Line • North East Line • Circle Line • Downtown Line • Thomson–East Coast Line | |
FutureJurong Region Line • Cross Island Line | ||
Rolling Stocks | 151 • 151A • 151B • 151C • R151 • T251 • 651 • 751A • 751B • 751C • 830 • 830C • 851E • 951 | |
FutureJ151 • CR151 | ||
Depots | Bishan • Changi • Gali Batu • Kim Chuan • Mandai • Sengkang • Ulu Pandan • Tuas | |
FutureChangi East • East Coast • Tengah |