Alstom MOVIA R151

From SgWiki
Revision as of 14:37, 23 June 2020 by SMB315C (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Bombardier MOVIA CR151

*Graphic From SGTrains/Wikipedia/LTA
In service 2021 onwards
Manufacturer Bombardier Transportation
CNR Changchun
Origin Changchun, China
Constructed 2019 onwards
Number Built 396 cars (66 Trains)
Statistics
Body Construction Welded aluminium
Doors 1.45 m, 8 per car
Maximum Speed Design: 90 km/h
Service: 80 km/h
Traction Control IGBT-VVVF (Bombardier MITRAC)
Line Voltage 750V DC Third Rail
Track Gauge 1435 mm Standard Gauge

Bombardier MOVIA CR151 are the future seventh generation of trains running on the North–South Line and the East–West Line.

History

Land Transport Authority (LTA) announced on 25 July 2018 that it has awarded the tender to Bombardier at a price of S$827 million.[1][2][3][4]

References

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah

Template:North South Line Template:East West Line