Bishan Depot

From SgWiki
Jump to navigation Jump to search
Bishan Depot
碧山车厂
Address 300 Bishan Road, Singapore 579828
Coordinates 1°21′19.03″N, 103°51′14.43″E
Owner Land Transport Authority
Operator SMRT Corporation
Line(s) North South Line and East West Line
Capacity 53 trains
Area 300,000m²

Bishan Depot is a MRT depot operated by SMRT Corporation, located at Bishan along the North South Line.

It houses a central maintenance with train overhaul facilities for trains on the North South Line and East West Line. It is also a school for newly recruited staff to train them in their assigned job and it is where the faregate operation department is located. The rolling stock workshop and Tracks 10 to 12 are the locations where the refurbishment of the Kawasaki Heavy Industries C151 trains takes place.

The depot was completed in 1987 by American architect Vikas M. Gore and the 12,000 square metres maintenance area at cost of S$300 million.

SMRT Cram Jam!

On the 11 February 2007, SMRT Organized the SMRT Cram Jam! cum Learning Journey and Charity Bazaar to raise funds for the SMRT Silver Tribute Fund. The Cram Jam took place in the morning seeking an entry into the Singapore Book Of Records by cramming people inside a Kawasaki Heavy Industries C151 Car 2027, a Mercedes-Benz O405G (Hispano Habit) Bus, TIB1202K and a Ssangyong Rodius/Stavic MPV Cab. The Singapore Police Force crammed 550 officers inside the train car, 235 staff from SMRT crammed inside the bus and an amazing 44 Girl Guides Singapore Cadets crammed themselves into the cab. Games and Carnival Food were organized and a 90-minute tour around the Bishan Depot.

Incidents

A MRT train, C751B [311/312] has been vandalised in an apparent security breach at a depot. The train was then put into service before the vandalism was discovered.

LTA said that SMRT failed to detect, in a timely manner, the security breach at its Bishan depot and the graffiti on one of its MRT trains on 17 August 2011 and the transport company was fined for the security breach. [1]

In May 2014, a C151A was vandalised.

In November 2014, a C151 was vandalised.

Upgrading

On 7 March 2012, Minister for Transport, Mr Lui Tuck Yew, announced on Committee of Supply Debate 2012 in Parliament that upgrading of existing North South Line and East West Line depots to be started and completed by 2014. [2]

References

Related Links

icon Mass Rapid Transit [ VTE ]
Overview HistoryStationsFare and TicketingFacilitiesSafetySecurity
Lines North–South LineEast–West LineNorth East LineCircle LineDowntown LineThomson–East Coast Line

FutureJurong Region LineCross Island Line

Rolling Stocks 151151A151B151CR151T251751A751B751C830830C851E951

Former651

Future J151 • CR151

Depots BishanChangiGali BatuKim ChuanMandaiSengkangUlu PandanTuas
Future Changi East • East CoastTengah